Study on the deformation features and resilience evaluation of tunnels  in the construction of closely-spaced tunnels
LIU Jicheng¹, ZHANG Xuefeng¹, ZHEN Yuchao¹, LIN Qingtao²*, YANG Chenghe², LU Dechun², DU Xiuli²
(1. China Construction Road and Bridge Group Co., Ltd., Shijiazhuang 050011, Hebei, China) (2. Institute of Geotechnical and Underground Engineering, Beijing University of Technology, Beijing 100124, China)
下载:  PDF (7387KB) 
输出:  BibTeX | EndNote (RIS)      
摘要 小净距隧道左右洞之间距离较小,后行隧道施工扰动极易威胁先行隧道的结构安全,实现小净距隧道工程中先行隧道结构抵抗后行隧道施工扰动能力和扰动后功能恢复能力的量化评估,即韧性评价,对于小净距隧道的安全建设具有重要意义。以新晋高速公路韩口隧道中小净距隧道为背景工程,考虑工程中Ⅴ级围岩段隧道埋深和净距的变化,基于ABAQUS平台建立9种工况(3种埋深×3种净距)的有限元模型,并基于实测隧道拱顶沉降和收敛变形验证数值模型的合理性。研究发现,相较于水平收敛,后行隧道施工拱顶沉降对应的先行隧道功能降低更为显著,更适合作为韧性计算的指标。基于确定的韧性计算指标和性能演化规律,实现了各工况下抗力韧性和恢复韧性的指数计算。在相同埋深下,隧道净距从10 m增大到30 m,先行隧道的抗力韧性指数和恢复韧性指数提高1.0%~9.0%;在相同净距下,隧道埋深从150 m减小到50 m,先行隧道的抗力韧性指数和恢复韧性指数提高4.0%~12.0%。隧道净距越大、埋深越小,隧道的抗力韧性指数和恢复韧性指数越高,所有工况中仅埋深150 m、净距10 m的工况先行隧道的韧性处于中韧性等级,其他工况下先行隧道为处于高韧性等级。本研究为小净距隧道的韧性设计与施工提供了量化评价方法,可为类似工程的建设提供参考。
服务
把本文推荐给朋友
加入引用管理器
E-mail Alert
RSS
作者相关文章
刘吉诚
张雪峰
甄玉超
林庆涛
杨成贺
路德春
杜修力
关键词:  小净距  深埋隧道  拱顶沉降  隧道功能  韧性评价    
Abstract: The construction of closely-spaced tunnels, characterized by the limited clearance between adjacent drifts, posed significant challenges as the excavation of the subsequent tunnel could induce considerable disturbances that jeopardized the structural integrity of the pilot tunnel. Quantifying the resilience of the pilot tunnel-defined as its capacity to withstand construction-induced disturbances from the subsequent tunnel and to recover its functionality thereafter-was therefore crucial for ensuring safety during the construction of closely-spaced tunnels. This study investigated the Hankou Spiral Tunnels, a closely-spaced tunnel complex within the Xinjin Expressway project. Finite element models for nine distinct scenarios, encompassing three varying burial depths and three clear distances in a Grade V rock mass, were developed using the ABAQUS platform. The validity of the numerical model was confirmed through comparison with field monitoring data, specifically tunnel crown settlement and convergence deformation. Analysis revealed that crown settlement induced by subsequent tunnel excavation led to more pronounced functional degradation of the pilot tunnel compared to horizontal convergence, establishing it as the more appropriate indicator for resilience quantification. Based on the identified resilience evaluation indicators and structural performance evolution patterns, both resistance resilience index and recovery resilience index were calculated for all working conditions. The results demonstrated that increasing the pillar width from 10 m to 30 m under constant burial depth conditions enhanced the resistance and recovery resilience indices by 1.0%-9.0%, while reducing the burial depth from 150 m to 50 m under constant pillar width conditions improved these indices by 4.0%-12.0%. Generally, larger pillar widths and shallower burial depths resulted in higher resilience indices, with only the scenario combining 150 m burial depth and 10 m pillar width classified as medium resilience level, while all other configurations achieved high resilience level. This research provided a quantitative assessment framework for resilience-oriented design and construction of closely-spaced tunnels, offering valuable references for similar underground engineering projects.
Key words:  closely-spaced    deep tunnel    crown settlement    tunnel functionality    resilience assessment
收稿日期:  2025-10-21      修回日期:  2025-11-16      发布日期:  2026-02-28     
中图分类号:  U45  
  TU452  
基金资助: 国家自然科学基金面上资助项目(52478383);国家自然科学基金杰青资助项目(52025084);国家重点研发计划资助项目 (2022YFC3800901);北京市博士后资助项目(2024-ZZ-21);湖南科技大学岩土工程稳定控制与健康监测省重点实验室开放基金资助项目(E22419)
通讯作者:  林庆涛(1987—)男,山东聊城人,副研究员,硕士生导师,博士,主要研究方向为岩土与城市地下工程。    E-mail:  linqingtao@bjut.edu.cn
作者简介:  刘吉诚(1971—),男,北京人,高级工程师,主要研究方向为桥梁、隧道建设。E-mail:1062533816@ qq.com
引用本文:    
刘吉诚, 张雪峰, 甄玉超, 林庆涛, 杨成贺, 路德春, 杜修力. 小净距隧道施工地层和隧道变形特征及韧性评价研究[J]. 隧道与地下工程灾害防治, .
LIU Jicheng, ZHANG Xuefeng, ZHEN Yuchao, LIN Qingtao, YANG Chenghe, LU Dechun, DU Xiuli. Study on the deformation features and resilience evaluation of tunnels  in the construction of closely-spaced tunnels. Hazard Control in Tunnelling and Underground Engineering, 0, (): 1-17.
链接本文:  
[1] 涂智溢, 郭洪雨, 孙飞, 钟方杰, 郑浩龙, 张哲. 闹市区复杂环境下大直径盾构小净距下穿运营地铁隧道的应对措施及分析[J]. 隧道与地下工程灾害防治, 2021, 3(4): 75-84.
[2] 刘宏达,杨天亮,张冬梅. 基于离散元分析的砂土深埋盾构隧道土压力计算方法[J]. 隧道与地下工程灾害防治, 2020, 2(2): 31-40.
[3] 焦玉勇, 张为社, 欧光照, 邹俊鹏, 陈光辉. 深埋隧道钻爆法开挖段突涌水灾害的形成机制及防控研究综述[J]. 隧道与地下工程灾害防治, 2019, 1(1): 36-46.
No Suggested Reading articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
网站版权 © 《隧道与地下工程灾害防治》编辑部
地址:山东省济南市山大南路27号山东大学中心校区明德楼B733《隧道与地下工程灾害防治》编辑部, 邮编:250100, 电话:0531-88366735, E-mail:tunnel@sdu.edu.cn
本系统由北京玛格泰克科技发展有限公司设计开发 技术支持:support@magtech.com.cn