1. School of Civil Engineering, Central South University, Changsha 410075, Hunan, China; 2. CCCC Fourth Highway Engineering Co., Ltd., Beijing 100022, China
Abstract: Aiming at the problems of subjective deviation, language ambiguity and incomplete information in the evaluation of green construction of tunnels in Karst area, a fuzzy comprehensive evaluation model for tunnel green construction was established based on extension analytic hierarchy process and grey system theory. The extension interval judgment matrix was used to deal with the subjective fuzziness of the index weight of green tunnel construction, the grey system theory was used to consider the index scores of multiple experts under the influence of incomplete information, and the comprehensive evaluation weight vector was obtained by combining the two, so as to improve the accuracy of the evaluation results.Through computer programming language Python development based on the model algorithm evaluation software, the software was applied to the green construction evaluation of the Dongqi Tunnel from Guilin to Liucheng Expressway, the evaluation results showed that the green construction grade of Dongqi Tunnel was good, and the performance of water pollution and material saving needed to be improved. The evaluation results were consistent with the actual situation of the Dongqi Tunnel construction site. The proposed model provided a new reference for the green construction evaluation of similar tunnels in Karst area.
周中, 丁昊晖, 张俊杰, 秦玉德. 基于EAHP-GST的岩溶地区隧道绿色建造模糊评价[J]. 隧道与地下工程灾害防治, 2021, 3(1): 29-36.
ZHOU Zhong, DING Haohui, ZHANG Junjie, QIN Yude. Fuzzy evaluation model based on EAHP-GST for green construction of tunnel in Karst area. Hazard Control in Tunnelling and Underground Engineering, 2021, 3(1): 29-36.
[1] 王晓形. 基于AHP及专家打分法的大跨度隧道风险评估[J]. 现代隧道技术, 2020,57(增刊1): 233-240. WANG Xiaoxing. Risk assessment of the large-span tunnel based on AHP and expert scoring method[J]. Modern Tunnelling Technology, 2020, 57(Suppl.1): 233-240. [2] 柳献, 孙齐昊. 盾构隧道衬砌结构连续性破坏事故案例分析[J]. 隧道与地下工程灾害防治, 2020,2(2): 21-30. LIU Xian, SUN Qihao. Case analysis on progressive collapse of shield tunnel linings[J]. Hazard Control in Tunnelling and Underground Engineering, 2020, 2(2): 21-30. [3] 吴艳明,王艳波,李军,等.天津空港国际医院工程绿色施工中节材技术措施[J]. 施工技术, 2015,44(10): 49-51. WU Yanming, WANG Yanbo, LI Jun, et al. Material saving measures for green construction in Tianjin Airport International Hospital[J]. Construction Technology, 2015, 44(10): 49-51. [4] 吕玉香,蒋勇军,王正雄,等. 西南岩溶槽谷区隧道建设的水文生态环境效应研究进展[J]. 生态学报, 2020, 40(6): 1851-1864. LÜ Yuxiang, JIANG Yongjun, WANG Zhengxiong, et al. Review on the hydrology and the ecological and environmental effects of tunnel construction in the Karst valley of Southwest China[J]. Acta Ecologica Sinica, 2020, 40(6): 1851-1864. [5] 袁政成, 黄法礼, 王振, 等. 隧道洞渣在建筑材料中的资源化综合利用研究进展[J]. 硅酸盐通报, 2020,39(8):2468-2475. YUAN Zhengcheng, HUANG Fali, WANG Zhen, et al. Review on resources comprehensive utilization of tunnel muck in building materials[J]. Bulletin of the Chinese Ceramic Society, 2020, 39(8): 2468-2475. [6] 郭陕云. 论隧道工程的环境问题及对策[J]. 隧道建设, 2014,34(9): 815-822. GUO Shanyun. Environment issues of tunnels and their countermeasures[J]. Tunnel Construction, 2014, 34(9): 815-822. [7] 傅鹤林, 黄震, 王慧, 等. 地铁安全事故分析及安全管理[J]. 隧道与地下工程灾害防治, 2019, 1(2): 59-66. FU Helin, HUANG Zhen, WANG Hui, et al. Accident analysis and management of metro safety[J]. Hazard Control in Tunnelling and Underground Engineering, 2019, 1(2): 59-66. [8] 李海文, 鲍学英. 青藏高原地区铁路隧道绿色施工水平综合评价[J].铁道科学与工程学报, 2021,18(2):524-532. LI Haiwen, BAO Xueying. Comprehensive evaluation of the green construction level of railway tunnels in the Qinghai-Tibet Plateau[J].Journal of Railway Science and Engineering, 2021,18(2):524-532. [9] 王剑宏,常洪雷,刘健,等.水下盾构隧道耐久性与全生命周期设计[J]. 隧道与地下工程灾害防治, 2020,2(2): 1-13. WANG Jianhong, CHANG Honglei, LIU Jian, et al. The durability of underwater shield tunnel and its life-cycle design[J]. Hazard Control in Tunnelling and Underground Engineering, 2020, 2(2): 1-13. [10] 刘瑞, 鲍学英. 基于熵值修正的G2法的绿色施工节水措施效益综合评价[J]. 水资源与水工程学报, 2020,31(3): 169-174. LIU Rui, BAO Xueying. Comprehensive evaluation of green construction water saving measures based on entropy corrected G2 method[J]. Journal of Water Resources and Water Engineering, 2020, 31(3): 169-174. [11] 万炳彤, 鲍学英, 李爱春. 西北寒旱地区铁路路基绿色施工水平综合评价[J]. 土木工程与管理学报, 2019,36(3): 197-202. WAN Bingtong, BAO Xueying, LI Aichun. Comprehensive evaluation of the green construction level of railway subgrade in the northwest cold arid region[J]. Journal of Civil Engineering and Management, 2019, 36(3):197-202. [12] 柯丽华, 张莹, 李全明, 等. 基于EAHP的尾矿库溃坝风险多级模糊综合评价研究[J]. 金属矿山, 2020(11): 37-43. KE Lihua, ZHANG Ying, LI Quanming, et al. Multi-level fuzzy comprehensive evaluation model based on EAHP for dam break risk of tailings pond[J]. Metal Mine, 2020(11): 37-43. [13] 刘俊伟. 基于可拓层次理论的绿色建筑绿色度评价研究[D].青岛: 青岛理工大学, 2019. LIU Junwei. Research on green degree evaluation of green building based on fuzzy extension analytic hierarchy process[D]. Qingdao: Qingdao University of Technology, 2019. [14] 杜婷, 孙勋来, 孙同盼, 等. 基于灰色理论的商品混凝土生产过程质量评价[J]. 土木工程与管理学报, 2020, 37(6):26-30. DU Ting, SUN Xunlai, SUN Tongpan, et al. Quality evaluation of production process of commercial concrete based on grey theory[J]. Journal of Civil Engineering and Management, 2020, 37(6): 26-30. [15] ZHOU Q H, WU G Z, WANG Z X, et al. Analysis and prediction of the width of spreading carbon fiber tow based on gray system theory[J]. Journal of Applied Polymer Science, 2021, 138(12):e50069. [16] 环境保护部国家质量监督检验检疫总局. 环境空气质量标准:GB3095—2012[S]. 北京: 中国标准出版社, 2012. [17] 环境保护部国家质量监督检验检疫总局. 声环境质量标准:GB3096—2008[S]. 北京: 中国标准出版社, 2008. [18] 原国家环境保护总局..污水综合排放标准:GB8978—1996[S]. 北京: 中国标准出版社, 1996. [19] 云南省质量技术监督局,云南云岭高速公路养护绿化工程有限公司.云南省地方标准:绿色公路评价标准DB53/T449—2013[S].北京:人民交通出版社, 2013. [20] 中华人民共和国住房和城乡建设部.绿色建筑评价标准:GB/T 50378—2019[S].北京:中国标准出版社, 2019.