Abstract: In view of the characteristics of Chongqing Metro Station, such as large section, weak surrounding rock and great interference of cross construction, the mechanical properties and supporting measures of surrounding rock of super large section tunnel reserved middle rock column were studied. Based on Protodyakonov's theory, considering the influence of middle rock column, the calculation span of natural equilibrium arch was modified, and the calculation method of surrounding rock stress of reserved rock column was deduced, which was verified by actual case and numerical simulation. In order to improve the stability of surrounding rock, temporary steel support was added to the middle rock column, and the finite element software was used to simulate the support scheme and removal time of the reserved middle rock column. Considered the surrounding rock deformation, stress and site construction situation, the analysis showed that, temporary horizontal support adopted a layer of temporary horizontal bracing design.On the basis of meeting the deformation and stress of surrounding rock, it saved materials and reduces costs.It also improved the efficiency of construction. After the temporary support was removed after the invert construction, the vertical displacement of the vault of the tunnel, the horizontal displacement of the arch waist and the maximum vertical stress were the smallest when compared with the other two removal times.
罗彬, 杨晖, 刘宁, 蔡炜. 超大断面隧道预留中岩柱围岩应力及其支撑控制技术[J]. 隧道与地下工程灾害防治, 2021, 3(1): 48-57.
LUO Bin, YANG Hui, LIU Ning, CAI Wei. Surrounding rock stress of rock pillar and its support control technology in super-large cross-section tunnel. Hazard Control in Tunnelling and Underground Engineering, 2021, 3(1): 48-57.
[1] 高红兵.大跨径铁路车站隧道施工力学特性研究[J].现代隧道技术,2010,47(3):32-38. GAO Hongbing. Study on mechanical performance for the construction of a large-span railway station tunnel[J]. Modern Tunnelling Technology, 2010, 47(3):32-38. [2] 李讯,何川,耿萍,等.浅埋超大断面暗挖隧道施工方法及支护力学特征[J].中南大学学报(自然科学版),2015,46(9): 3385-3395. LI Xun, HE Chuan, GENG Ping, et al. Construction schemes and supports mechanical characteristics of shallow embedded large-section tunnel[J]. Journal of Central South University(Science and Technology), 2015, 46(9): 3385-3395. [3] 陈志敏,冯亚松,薛智文.高地应力软岩隧道模型试验系统研发[C] //中国土木工程学会2019年学术年会论文集.上海:中国建筑工业出版社,2019:292-299. CHEN Zhimin, FENG Yasong, XUE Zhiwen. Development of model test system for high geostress tunnel with weak surrounding rock[C] //Proceedings of the 2019 Annual Academic Meeting of China Civil Engineering Society.Shanghai:China Architecture Publishing, 2019:292-299. [4] WANG Shuren, LI Chunliu, LIU Zhaowei, et al. Optimization of construction scheme and supporting technology for HJS soft rock tunnel[J].International Journal of Mining Science and Technology, 2014, 24(6):847-852. [5] 耿建仪,梁志辉,杨新安,等.八达岭长城站小净距三洞隧道中岩柱受力特性与支护优化研究[J].隧道建设(中英文),2019,39(12):2000-2010. GENG Jianyi, LIANG Zhihui, YANG Xin'an, et al. Mechanical behavior and support optimization of middle rock pillar in small clear spacing three-tube tunnel of Badaling Great Wall Station[J]. Tunnel Construction, 2019, 39(12): 2000-2010. [6] 孙景凤,李文华,董亥兴,等.超小净距大跨度隧道岩柱稳定性分析[J].中外公路,2014,34(2):210-214. [7] LI Pengfei, WANG Fan, FAN Lifeng, et al. Analytical scrutiny of loosening pressure on deep twin-tunnels in rock formations[J]. Tunnelling and Underground Space Technology Incorporating Trenchless Technology Research, 2019, 83:373-380. [8] 刘宁,陈凯,刘向远,等.地铁车站隧道双洞中岩柱开挖技术研究[J].铁道科学与工程学报,2020,17(9):2320-2327. LIU Ning, CHEN Kai, LIU Xiangyuan, et al. Study on excavation technology of rock column in double tunnel of subway station[J]. Journal of Railway Science and Engineering, 2020, 17(9): 2320-2327. [9] 姚勇,田志宇.并设小净距隧道中岩墙力学特征及加固措施研究[J].工业建筑,2006(4):57-60. YAO Yong, TIAN Zhiyu. Study on mechanical behavior and reinforcing measures of middle rock wall of parallel tunnel with small interval[J].Industrial Construction, 2006(4):57-60. [10] WU Mengjun, JIANG Shuping, ZHANG Yongxing, et al. Optimization of composite middle wall in large span and flat multi-arch tunnel[J]. Journal of Highway and Transportation Research and Development:English Edition, 2011, 5(2):74-79. [11] GAO Haidong, LI Gang, GUO Yanbing, et al. Stability analysis of the middle wall in process of double-arch tunnel construction[J]. IOP Conference Series: Earth and Environmental Science, 2020, 558(3):32046-32050. [12] LI Jun, WANG Zonglin. Force analysis of the middle wall in multi-arch tunnel under central hole+CRD method[J]. Applied Mechanics and Materials, 2014(580-583): 1188-1191. [13] YANG Lin, WANG Wei, JIANG Hong. Analysis on deformation control technology for large-span subway tunnels from high-narrow channel[C] //Proceedings of the 6th International Conference on Environmental Science and Civil Engineering(ESCE 2020).Nanchang, China: IOP Publishing, 2020:1322-1330. [14] 陈凌云. 公路穿煤隧道揭煤施工过程中岩柱稳定性分析[D].重庆:重庆大学,2009. CHEN Lingyun. Stability analysis of rock pillar in the uncovering coal process of highway tunnel tough coal seam[D].Chongqing:Chongqing University, 2009. [15] 余熠.浅埋大断面隧道核心土数值模拟与分析[J].河北工程大学学报(自然科学版),2014,31(3):35-38. YU Yi. Simulation and analysis of core rock in shallow buried large section tunnel[J]. Journal of Hebei University of Engineering(Natural Science Edition), 2014, 31(3):35-38. [16] 刘泉声,彭星新,雷广峰,等.特大断面浅埋暗挖隧道十字岩柱开挖技术模型试验研究[J].岩土力学,2017,38(10):2780-2788. LIU Quansheng, PENG Xingxin, LEI Guangfeng, et al.Geomechanical model test on excavation technology of supper-large cross-section ultra-shallow tunnel with cross rock pillar method[J]. Rock and Soil Mechanics, 2017, 38(10):2780-2787. [17] TONG Jingsheng. General formulas for calculating surrounding rock pressure of tunnels and underground spaces[J]. KSCE Journal of Civil Engineering, 2020, 24(4):1348-1356. [18] 李鹏飞,王帆,聂雄,等.深埋非对称连拱隧道围岩压力计算方法研究[J].岩土工程学报,2016,38(9):1625-1629. LI Pengfei, WANG Fan, NIE Xiong, et al. Methods for calculating rock pressure of symmetrical multi-arch deep tunnels[J]. Chinese Journal of Geotechnical Engineering, 2016, 38(9):1625-1629. [19] 王浩,杨新安,王斌,等.3洞小净距隧道围岩压力计算方法[J]. 中国铁道科学,2020,41(3):68-75. WANG Hao, YANG Xin'an, WANG Bin, et al. Calculation method for surrounding rock pressure of closely spaced triple tunnels[J]. China Railway Science, 2020, 41(3): 68-75. [20] 孙振宇,张顶立,房倩,等.浅埋小净距公路隧道围岩压力分布规律[J].中国公路学报,2018,31(9):84-94. SUN Zhenyu, ZHANG Dingli, FANG Qian, et al. Distribution of surrounding rock pressure of shallow highway tunnels with small spacing[J].China Journal of Highway and Transport, 2018, 31(9):84-94. [21] 李然,张顶立,房倩,等.深埋3孔小净距隧道围岩压力计算方法及其工程应用[J].中国铁道科学,2020,41(2):81-90. LI Ran, ZHANG Dingli, FANG Qian, et al. Calculation method for surrounding rock pressure of deeply buried closely spaced triple tunnels and its engineering application[J]. China Railway Science, 2020, 41(2):81-90. [22] YUN Yongfeng, WU Delun. Discussion on the calculation method of the deep buried tunnel surrounding rock loose pressure[J]. Applied Mechanics and Materials, 2012(193-194):757-761. [23] JIANG Y, YONEDA H, TANABASHI Y.Theoretical estimation of loosening pressure on tunnels in soft rocks[J].Tunnelling and Underground Space Technology, 2001,16(2):99-105. [24] NG C W W, LEE K M, TANG D K W.Three-dimensional numerical investigations of new Austrian tunnelling method(NATM)twin tunnel interactions[J].Canadian Geotechnical Journal, 2004, 41(3):523-539. [25] 张社荣,曹世伟,王超,等.浅埋偏压大跨度地铁隧道拆撑方案优化分析[J].铁道标准设计,2020,64(8):80-86. ZHANG Sherong, CAO Shiwei, WANG Chao, et al.Optimization analysis of temporary supports dismantling of shallow-buried large-span subway tunnel under unsymmetrical pressure[J]. Railway Standard Design, 2020, 64(8):80-86. [26] 雷震宇.超小间距隧道的拆撑分析[J].同济大学学报(自然科学版),2008,36(7):932-936. LEI Zhenyu. Analysis of dismantling shoring of tunnels with super small interval[J].Journal of Tongji University(Natural Science), 2008, 36(7):932-936. [27] 雷震宇,周顺华.浅埋大跨度隧道临时支撑的拆除分析[J]. 工程力学,2006,23(9):120-124. LEI Zhenyu, ZHOU Shunhua. Analysis of dismantling temporary support of shallow-depth large-span tunnel[J]. Engineering Mechanics, 2006, 23(9):120-124. [28] 伍尚干,严宗雪.龙头山隧道洞口段核心土临时支撑拆除方案研究[J].公路,2010(4):207-210. [29] 黄红元,张鸿,黎剑华,等.CRD工法拆除临时支撑时隧道衬砌受力分析[J].南昌工程学院学报,2010,29(3):17-19. HUANG Hongyuan, ZHANG Hong, LI Jianhua, et al. Force analysis of tunnel lining when removing temporary timbering with CRD excavation method[J]. Journal of Nanchang Institute of Technology, 2010, 29(3):17-19. [30] SUN Minglei, ZHU Yongquan, LI Xinzhi, et al. Experimental study of mechanical characteristics of tunnel support system in hard cataclastic rock with high geostress[J]. Shock and Vibration, 2020(2020):1-12. [31] CHEN S L, LEE S C, GUI M W.Effects of rock pillar width on the excavation behavior of parallel tunnels[J]. Tunnelling and Underground Space Technology, 2009, 24(2):148-154. [32] 龚建伍. 扁平大断面小净距公路隧道施工力学研究[D].上海:同济大学,2008. GONG Jianwu. Study on construction mechanical behavior of highway tunnel with large section and small spacing[D].Shanghai:Tongji University, 2008.