多滚刀切削混凝土桩基相互作用特性及扰动影响研究
沈翔1,张海彬2,段锴1*,曾庆成3,黄书华4
1.深圳大学土木与交通工程学院, 广东 深圳 518060;2.广州轨道交通建设监理有限公司, 广东 广州 510010; 3.广州海珠湾建设有限公司, 广东 广州 510240;4.中铁十四局大盾构工程有限公司, 江苏 南京 211800
Study on interaction mechanism and disturbance effect of multi disc cutter cutting concrete pile foundation
SHEN Xiang1, ZHANG Haibin2, DUAN Kai1*, ZENG Qingcheng3, HUANG Shuhua4
1. College of Civil and Transportation Engineering, Shenzhen University, Shenzhen 518060, Guangdong, China;
2. Guangzhou Rail Transit Construction Engineering Consulting Co., Ltd., Guangzhou 510010, Guangdong, China;
3. Guangzhou Haizhu Bay Construction Co., Ltd., Guangzhou 510240, Guangdong, China;
4. China Railway 14th Bureau Group Mega Shield Engineering Co., Ltd., Nanjing 211800, Jiangsu, China
下载:  PDF (14177KB) 
输出:  BibTeX | EndNote (RIS)      
摘要 为研究盾构法切削混凝土桩基的相互作用机理,以广州海珠湾公路隧道东线切除中核大厦群桩工程为研究背景,结合现场勘探资料,采用有限元软件对盾构单根辐条刀具切削桩基的过程进行数值模拟。研究重点分析了切桩过程中滚刀的受力情况以及土体和桩身的动态响应。仿真结果表明,桩身的位移响应在贯入阶段明显大于切削阶段,且贯入阶段的桩身响应主要集中在yz方向。此外,滚刀的法向力均值在贯入阶段高于切削阶段,尤其在切削介质强度差异较大的情况下,刀具的受力变化在切削介质交界处表现为明显突变,这种变化增加了刀具疲劳损伤的概率。该研究对盾构机在切桩过程中桩身、土体及刀具的响应进行了分析,所获得的结果可为后续类似工程施工过程中降低安全风险提供参考。
服务
把本文推荐给朋友
加入引用管理器
E-mail Alert
RSS
作者相关文章
沈翔
张海彬
段锴
曾庆成
黄书华
关键词:  城市地下空间  盾构法  切桩  隧道开挖    
Abstract: In order to investigate the interaction mechanism between a shield machine and concrete pile foundations during cutting, the cutting-pile project at the Zhonghe Building group on the East Line of the Haizhu Bay Highway Tunnel was selected as the case study. Based on on-site exploration data, a finite-element model was employed to simulate the process of cutting a single pile with the disc cutter. The cutting forces on the disc cutter and the dynamic responses of both the soil and the pile were analyzed in detail. The simulation results showed that the pile's displacement response during the penetration phase was significantly greater than during the cutting phase, with the responses during penetration being concentrated mainly in the y and z directions. Moreover, the mean normal force acting on the disc cutter was higher in the penetration phase than in the cutting phase; when the strength contrast between adjacent media was large, the cutter force exhibited a pronounced discontinuity at their interface, thereby increasing the possibility of fatigue damage. The responses of the pile, the surrounding soil, and the cutter were thus characterized throughout the cutting process, and the findings were expected to provide valuable guidance for reducing safety risks in similar shield tunneling projects.
Key words:  urban underground space    shield method    cutting piles    tunnel excavationReceived: 2025-04-09    Revised: 2025-05-14    Accepted: 2025-05-15    Published: 2025-06-20
发布日期:  2025-06-18     
中图分类号:  TU470  
基金资助: 广东省基础与应用基础研究基金资助项目(2023A1515010060)
作者简介:  沈翔(1991— ),男,浙江杭州人,助理教授,博士生导师,博士,主要研究方向为盾构隧道施工智能安全控制. E-mail: shenxiang@szu.edu.cn. *通信作者简介:段锴(1999— ),男,湖南娄底人,硕士研究生,主要研究方向为盾构隧道施工安全. E-mail:2310474113@email.szu.edu.cn
引用本文:    
沈翔,张海彬,段锴,曾庆成,黄书华. 多滚刀切削混凝土桩基相互作用特性及扰动影响研究[J]. 隧道与地下工程灾害防治, 2025, 7(2): 21-30.
SHEN Xiang, ZHANG Haibin, DUAN Kai, ZENG Qingcheng, HUANG Shuhua. Study on interaction mechanism and disturbance effect of multi disc cutter cutting concrete pile foundation. Hazard Control in Tunnelling and Underground Engineering, 2025, 7(2): 21-30.
链接本文:  
http://tunnel.sdujournals.com/CN/Y2025/V7/I2/21
[1] 陈湘生, 全昭熹, 陈一凡, 等. 极端环境隧道建造面临的主要问题及发展趋势[J]. 隧道建设(中英文), 2024, 44(3): 401-432. CHEN Xiangsheng, QUAN Zhaoxi, CHEN Yifan, et al. Primary challenges and developmental trends of tunnel construction in extreme environments[J]. Tunnel Construction, 2024, 44(3): 401-432.
[2] WANG G, QIAO S, LI G Y, et al. Direct shield cutting of large-diameter reinforced concrete group piles: case study on Shenyang Metro construction[J]. Case Studies in Construction Materials, 2023, 18: e01864.
[3] 徐前卫, 朱合华, 马险峰, 等. 地铁盾构隧道穿越桥梁下方群桩基础的托换与除桩技术研究[J]. 岩土工程学报, 2012, 34(7): 1217-1226. XU Qianwei, ZHU Hehua, MA Xianfeng, et al. Pile underpinning and removing technology of shield tunnels crossing through group pile foundations of road bridges[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(7): 1217-1226.
[4] 赵旭伟. 软土地层盾构下穿铁路枢纽沉降规律及施工控制[J]. 隧道与地下工程灾害防治, 2022, 4(2): 59-65. ZHAO Xuwei. The settlement law and construction control of railway hub traversed by a shield tunnel in soft ground[J]. Hazard Control in Tunnelling and Underground Engineering, 2022, 4(2): 59-65.
[5] 王春国. 复合地层全断面硬岩隧道掘进机下穿立交桥研究[J]. 山东大学学报(工学版), 2021, 51(3): 45-51. WANG Chunguo. Study on fall face hard rock tunnel boring machine through the overpass in composite stratum [J]. Joumal of Shandong University(Engineering Science), 2021, 51(3): 45-51.
[6] 王占生, 王全华, 袁大军. 盾构连续切削穿越大直径桥桩施工安全技术[J]. 都市快轨交通, 2013, 26(3): 97-101. WANG Zhansheng, WANG Quanhua, YUAN Dajun. Security technology for shield continuously cutting through large-diameter bridge piles[J]. Urban Rapid Rail Transit, 2013, 26(3): 97-101.
[7] 王飞. 盾构直接掘削大直径钢筋混凝土群桩研究[D]. 北京: 北京交通大学, 2014. WANG Fei. Study on direct excavation of large diameter reinforced concrete pile groups by shield[D]. Beijing: Beijing Jiaotong University, 2014.
[8] 王禹椋, 李继超, 廖少明. 深圳地铁9号线盾构切削群桩数值模拟与实测分析[J]. 隧道建设(中英文), 2017, 37(2): 192-199. WANG Yuliang, LI Jichao, LIAO Shaoming. Numerical simulation and measured data analysis of pile group cutting by shield: a case study of running tunnel on line No.9 of Shenzhen metro[J]. Tunnel Construction, 2017, 37(2): 192-199.
[9] 杜闯东, 张杰, 唐纵雄. 盾构直接切削桩基施工关键技术[J]. 隧道建设(中英文), 2019, 39(10): 1666-1677. DU Chuangdong, ZHANG Jie, TANG Zongxiong. Key technologies of shield direct cutting pile foundation[J]. Tunnel Construction, 2019, 39(10): 1666-1677.
[10] 朱斌, 王健, 徐壮, 等. 新建盾构隧道下穿既有构筑物施工的力学机理[J]. 山东大学学报(工学版), 2022, 52(4): 175-182. ZHU Bin, WANG Jian, XU Zhuang, et al. Mechanical mechanism of construction of new shield tunnel under existing structure[J]. Journal of Shandong University(Engineering Science), 2022, 52(4): 175-182.
[11] 阚梦璇. 盾构切削钢筋混凝土桩基机制及地表沉降分析[D]. 安徽: 安徽建筑大学, 2023. KAN Mengxuan. Analysis of shield cutting reinforced concrete pile foundation mechanism and ground settlement[D]. Anhui: Anhui Jianzhu University, 2023.
[12] 蒋啸天, 李章林, 何国军, 等. 大直径盾构切穿抗滑桩对堤岸的变形影响分析[J]. 上海大学学报(自然科学版), 2024, 30(1): 164-173. JIANG Xiaotian, LI Zhanglin, HE Guojun, et al. Analysis of large-diameter shield cutting through anti-slide pile and its effect on embankment deformation[J]. Journal of Shanghai University(Natural Science Edition), 2024, 30(1): 164-173.
[13] LIU B, LI T, HAN Y H, et al. DEM-continuum mechanics coupling simulation of cutting reinforced concrete pile by shield machine[J]. Computers and Geotechnics, 2022, 152: 105036.
[14] LI T, LIU B, HAN Y H, et al. Structural analysis of shield machine cutting monopile using p-y curve based finite element method[J].Computers and Geotechnics, 2023, 161: 105605.
[15] 邓楚键, 何国杰, 郑颖人. 基于M-C准则的D-P系列准则在岩土工程中的应用研究[J]. 岩土工程学报, 2006, 28(6): 735-739. DENG Chujian, HE Guojie, ZHENG Yingren. Studies on Drucker-Prager yield criterions based on M-C yield criterion and application in geotechnical engineering[J]. Chinese Journal of Geotechnical Engineering, 2006, 28(6): 735-739.
[16] SU J H, WANG Z X, REN W M, et al. Study and application of yield criteria to rock and soil[J]. Engineering Mechanics, 2003, 20(3): 72-77.
[17] 张信贵, 许胜才, 严利娥, 等. Drucker-Prager准则参数有效性及第二主应力对强度的影响分析[J]. 应用力学学报, 2015, 32(5): 810-816. ZHANG Xingui, XU Shengcai, YAN Li'e, et al. Validness analysis of parameters in Drucker-Prager criterion and effects of the second principal stress on strength[J]. Chinese Journal of Applied Mechanics, 2015, 32(5):810-816.
[1] 禹海涛, 陈志伟. 基于连续-离散耦合方法的隧道开挖对近断层的影响机制研究[J]. 隧道与地下工程灾害防治, 2021, 3(3): 20-28.
[2] 钱七虎. 科学利用城市地下空间,建设和谐宜居、美丽城市[J]. 隧道与地下工程灾害防治, 2019, 1(1): 1-7.
No Suggested Reading articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
网站版权 © 《隧道与地下工程灾害防治》编辑部
地址:山东省济南市山大南路27号山东大学中心校区明德楼B733《隧道与地下工程灾害防治》编辑部, 邮编:250100, 电话:0531-88366735, E-mail:tunnel@sdu.edu.cn
本系统由北京玛格泰克科技发展有限公司设计开发 技术支持:support@magtech.com.cn