Abstract: The settlement of bridge abutment should be strictly controlled during the tunneling shield construction under the shallow foundation of tied arch bridges. To investigate the effect of static pressure injection method on the settlement control of bridge abutment, the tunneling shield models in a subway construction under shallow foundation of tied arch bridges was set up and the sequential excavation of the tunneling shields was simulated by FLAC3D. The numerical simulation results indicated that the settlement of bridge abutment would exceed the regulation requirement. Reinforced by the static pressure injection method, the bridge abutment was numerically simulated once again by adjusting relative parameters. The latter simulating results indicated the settlement of bridge abutment was well controlled. By monitoring the settlements of bridge abutment and deck in the construction, the numerical results were validated and the static pressure injection method was proved to be effective on settlement controlling of bridge abutment.
温法庆. 土压平衡盾构穿越浅基础拉杆拱桥施工沉降控制技术研究[J]. 隧道与地下工程灾害防治, 2019, 1(2): 114-123.
WEN Faqing. Settlement control method for shallow foundation tied arch bridge lying over earth-pressure balance shield construction. Hazard Control in Tunnelling and Underground Engineering, 2019, 1(2): 114-123.
凌同华, 张胜, 李升冉,等. 邻近隧道施工既有桥桩变形控制及注浆加固方案优化[J]. 中南大学学报(自然科学版),2014,45(7):2394-2400. LING Tonghua, ZHANG Sheng, LI Shengran, et al. Controlling of existing bridge piles deformation induced by adjacent tunneling and scheme of optimizing grouting reinforcement[J]. Journal of Central South University(Science and Technology), 2014, 45(7): 2394-2400.
[2]
彭正勇. 注浆抬升在隧道穿越既有建筑物中的研究及应用[J]. 岩石力学与工程学报, 2011, 30(增刊1): 2963-2969. PENG Zhengyong. Study of grouting uplifting for existing buildings traversed by tunnel and its application[J]. Chinese Journal of Rock Mechanics and Engineering, 2011, 30(Suppl.1): 2963-2969.
[3]
唐智伟, 赵成刚. 注浆抬升地层的机制、解析解及数值模拟分析[J]. 岩土力学,2008,29(6):1512-1516. TANG Zhiwei, ZHAO Chenggang. Mechanisms of ground heave by grouting and analytical solutions & numerical modeling[J]. Rock and Soil Mechanics, 2008, 29(6): 1512-1516.
[4]
王乾, 曲立清, 郭洪雨,等. 青岛胶州湾海底隧道围岩注浆加固技术[J]. 岩石力学与工程学报, 2011, 30(4): 790-802. WANG Qian, QU Liqing, GUO Hongyu, et al. Grouting reinforcement technique of Qingdao Jiaozhou Bay Subsea Tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 2011, 30(4): 790-802.
[5]
沈建文, 刘力. 盾构隧道施工对临近桥桩影响数值及现场监测研究 [J]. 岩土力学, 2015, 36(2): 709-713. SHEN Jianwen, LIU Li. Numerical analysis and field monitoring for studying effects of shield tunneling on nearby piles [J]. Rock and Soil Mechanics, 2015, 36(2): 709-713.
[6]
赵坤, 杜守继, 陈军,等. 盾构穿越立交桥桩时微扰动控制施工的数值分析[J].地下空间与工程学报,2017,13(6): 1608-1615. ZHAO Kun, DU Shouji, CHEN Jun, et al. Numerical analysis on small disturbance control in shield crossing the piles of bridge[J]. Chinese Journal of Underground Space and Engineering, 2017, 13(6): 1608-1615.
[7]
温法庆, 张立泉, 柴庆水,等. 土压平衡盾构下穿浅埋石砌古石拱桥施工技术[C] //第三届全国智慧城市与轨道交通学术会议。苏州:[出版者不详] ,2016: 304-311. WEN Faqing, ZHANG Liquan, CHAI Qingshui, et al. Construction technology of EPB shield under ancient stone arch bridge[C] //Proceedings of the 3rd Intelligent Cities and Rail Transportation. Suzhou:[s.n.] , 2016: 304-311.
[8]
熊志辉. 地铁盾构施工对邻近桥梁桩基的影响及防护研究[D]. 西安: 西安科技大学, 2017. XIONG Zhihui. Influence and protection of pile foundation of adjacent bridge with subway shield construction[D]. Xi'an:Xi'an University of Science and Technology, 2017.
安永林, 彭丽敏, 张峰,等. 隧道施工时地表沉降监测控制标准探讨[J]. 岩土力学, 2009, 30(2): 446-451. AN Yonglin, PENG Limin, ZHANG Feng, et al. Discussion on settlement standard of ground surface during tunneling[J]. Rock and Soil Mechanics, 2009, 30(2): 446-451.
[15]
陈星欣, 白冰. 隧道下穿既有结构物引起的地表沉降控制标准研究[J]. 工程地质学报, 2011, 19(1): 103-108. CHEN Xingxin, BAI Bing. Control standards for settlement of ground surface with existing structures due to underground construction of crossing tunnels[J]. Journal of Engineering Geology, 2011, 19(1): 103-108.
[16]
张海彦, 何平, 胡友刚,等. 盾构隧道穿越既有桥梁桩基础风险控制值的确定[J]. 北京交通大学学报, 2013, 37(6): 45-50. ZHANG Haiyan, HE Ping, HU Yougang, et al. Determination of risk control values in the project of shield tunnel across the existing bridge pile foundation[J]. Journal of Beijing Jiaotong University, 2013, 37(6): 45-50.
[17]
赵忠胜. 五里墩立交桥A2匝道盾构施工对桩基的风 险分析[D]. 合肥: 安徽建筑大学, 2017. ZHAO Zhongsheng. Risk analysis of foundation in shield construction of A2 Ramp of Wulidun overpass[D]. Hefei: Anhui Jianzhu University, 2017.
[18]
刘毅. 地铁隧道开挖对建筑结构沉降控制标准研究 [D]. 成都: 西南交通大学, 2001. LIU Yi. Study on the criterion of building subsidence due to metro tunneling[D]. Chengdu: Southwest Jiaotong University, 2001.