A review of the research progress on structural design methods of shallow buried underground subway stations in Beijing
LI Zhaoping1, SHI Leilei2
1. School of Civil Engineering, Beijing Jiaotong University, Beijing 100044, China; 2. Beijing No.4 Municipal Construction Engineering Co., Ltd., Beijing 100176, China
Abstract: Due to the influence of urban characteristics, road traffic conditions, municipal pipelines and various buildings, the construction of metro station with shallow excavation method occupies an important proportion. Combined with the research results of the design of the metro station structure scheme in recent years, based on the risk control of subway station structure and surrounding environment,this paper introduced the research progress in calculation method of vertical soil pressure at the arch of metro station, control standard of surface subsidence, design of soil reinforcement, bearing capacity of initial support and key working conditions of structure etc.
李兆平, 史磊磊. 北京地区暗挖地铁车站结构设计方法研究进展综述[J]. 隧道与地下工程灾害防治, 2019, 1(3): 14-21.
LI Zhaoping, SHI Leilei. A review of the research progress on structural design methods of shallow buried underground subway stations in Beijing. Hazard Control in Tunnelling and Underground Engineering, 2019, 1(3): 14-21.
李兆平. 复杂外部条件下地铁车站结构方案探讨[J].北京交通大学学报,2018,42(4):1-7. LI Zhaoping. Study on subway station structure constrained by complex external conditions[J]. Journal of Beijing Jiaotong University, 2018, 42(4):1-7.
李玉峰,彭立敏,张永红,等.线性与非线性破坏准则下浅埋隧道围岩压力计算[J].现代隧道技术,2013,50(5):68-74. LI Yufeng, PENG Limin, ZHANG Yonghong, et al. Calculations of surrounding rock pressures of shallow buried tunnels under linear and nonlinear failure criteria[J].Modern Tunnelling Technology, 2013, 50(5):68-74.
[4]
曲星,李宁.松散岩体竖向压力计算方法剖析及隧洞深浅埋划分方法研究[J].岩石力学与工程学报,2011,30(增刊1):2749-2757. QU Xing, LI Ning. Aanlysis of calculation method of vertical pressure in loose rock mass and research on dividing line standard for deep-and shallow-buried tunnels[J]. Chinese Journal of Rock Mechanics and Engineering, 2011, 30(Suppl.1):2749-2757.
[5]
汪丁建,唐辉明,李长冬,等.考虑主应力偏转的土体浅埋隧道支护压力研究[J].岩土工程学报,2016,38(5):804-810. WANG Dingjian, TANG Huiming, LI Changdong, et al. Theoretical study on earth pressure on shallow tunnel considering principal stress rotation[J].Chinese Journal of Geotechnical Engineering, 2016, 38(5):804-810.
[6]
贺少辉,项彦勇,李兆平.地下工程[M]. 北京:清华大学出版社,北京交通大学出版社, 2008.
[7]
北京交通大学.北京地铁九号线标准化设计研究报告[R].北京:北京交通大学,2012.
[8]
姚宣德,王梦恕. 地下浅埋暗挖法施工引起的地表沉降控制标准的统计分析[J]. 岩石力学与工程学报, 2006, 25(10): 2030-2035. YAO Xuande, WANG Mengshu. Statistic analysis of guideposts for ground settlement induced by shallow tunnel construction[J]. Chinese Journal of Rock Mechanics and Engineering, 2006, 25(10):2030-2035.
[9]
李兆平,聂楠,杨成永,等. 矿山法地铁隧道二衬结构安全系数及可靠度计算方法研究[J].北京交通大学学报,2011,35(1):39-43. LI Zhaoping, NIE Nan, YANG Chengyong, et al. Study on the calculation method of the tunnel inner lining structure Safety factor and reliability index for mining subway tunnel[J]. Journal of Beijing Jiaotong University, 2011, 35(1):39-43.
[10]
张晋毅.中洞法开挖的地铁车站二衬结构施工受力分析[D].北京:北京交通大学,2006. ZHANG Jinyi.Numerical analysis for secondary-lining of subway station tunneled in center drift method[D].Beijing: Beijing Jiaotong University, 2006.
[11]
李兆平,汪挺,项彦勇,等. 北京地铁工程邻近桥桩施工风险评估及控制对策探讨[J].岩土力学,2008,29(7):1837-1842. LI Zhaoping, WANG Ting, XIANG Yanyong, et al. A study on risk grade classification method and disposal measures for adjacent bridge piles in Beijing metro engineering [J]. Rock and Soil Mechanics, 2008, 29(7):1837-1842.
[12]
李兆平,朱元生.邻近桥桩暗挖地铁车站施工方案及桥桩保护措施研究[J].岩石力学与工程学报,2008,27(增刊1):3132-3139. LI Zhaoping, ZHU Yuansheng. Research on construction method of metro station adjacent to bridge piles and reinforcement measures for bridge piles[J]. Chinese Journal of Rock Mechanics and Engineering, 2008, 27(Suppl.1):3132-3139.