Simulation analysis of the mechanical mechanism of shield cutter cutting reinforced concrete based on the coupling of discrete element and continuum method
LI Ting1, LIU Bo2,3, HU Wei1, SUN Peng2, HUANG Xiaocheng1
1. School of Civil Engineering, Hunan University of Science and Technology, Xiangtan 411201, Hunan, China; 2. School of Mechanics and Civil Engineering, China University of Mining and Technology, Beijing 100083, China; 3. National Key Laboratory of Disaster Prevention and Control and Intelligent Construction and Maintenance of Tunnel Engineering, China University of Mining and Technology, Beijing 100083, China
Abstract: During the launching and receiving phases of shield tunneling, as well as during the traversal of building pile foundations, the shield cutter is required to cut through heterogeneous composite materials like reinforced concrete. This process often leads to technical challenges including cutterhead chipping, accelerated wear, and steel bar-induced clogging of the screw conveyor, which ultimately compromises tunneling efficiency. To explore the influence of internal steel bars on the dynamic failure process of concrete structures and the cutting force of the cutterhead during the cutting process, a coupling method combining the discrete element-based particle flow program and continuum mechanics was adopted to study the dynamic failure process of the cutterhead cutting reinforced concrete. Firstly, the contact parameters for the simulated steel bars and concrete materials were calibrated, and a coupling simulation analysis model of the cutterhead cutting reinforced concrete was established. The variation laws of the cutting force of the C-type(single-sided blade)and the F-type(double-sided blade)were studied under different cutting depths and cutter spacings when cutting concrete and reinforced concrete respectively. The results showed that when the F-type tool cuts concrete, the relationship between the cutting depth and the cutting force could be fitted using the arctangent function, and the cutting force was less affected by the tool spacing; when cutting reinforced concrete, the average cutting force was approximately 5 to 7 times higher than that for plain concrete. The F-type tool exhibited a stronger pulling effect on the reinforcing bars, but the average cutting force of the C-type tool was approximately 21% to 39% higher than that of the F-type tool.
李烃,刘波,胡伟,孙鹏,黄小城. 基于离散元-连续介质法耦合的盾构刀具切削钢筋混凝土力学机理仿真分析[J]. 隧道与地下工程灾害防治, 2026, 8(1): 32-42.
LI Ting, LIU Bo, HU Wei, SUN Peng, HUANG Xiaocheng. Simulation analysis of the mechanical mechanism of shield cutter cutting reinforced concrete based on the coupling of discrete element and continuum method. Hazard Control in Tunnelling and Underground Engineering, 2026, 8(1): 32-42.
[1] 钱七虎. 城市地下穿越工程的新理论与新技术[J]. 城市轨道交通研究, 2018, 21(11): 7, 20. QIAN Qihu. New theory and technology of urban underground crossing engineering[J]. Urban Mass Transit, 2018, 21(11): 7, 20. [2] 徐长节, 陈其志, 任凌云. 软土地区地铁盾构穿越对城市立交桥的影响分析[J]. 地下空间与工程学报, 2016, 12(3): 769-775. XU Changjie, CHEN Qizhi, REN Lingyun. Influence of shield crossing tunnels in soft soil area on city overpass[J]. Chinese Journal of Underground Space and Engineering, 2016, 12(3): 769-775. [3] LIU B, LI T, HAN Y H, et al. DEM-continuum mechanics coupling simulation of cutting reinforced concrete pile by shield machine[J]. Computers and Geotechnics, 2022, 152: 105036. [4] LI T, LIU B, HAN Y H, et al. Structural analysis of shield machine cutting monopile using p-y curve based finite element method[J]. Computers and Geotechnics, 2023, 161: 105605. [5] 崔允亮, 李志远, 魏纲, 等. 上跨拟建隧道的地下综合管廊预保护效果[J]. 浙江大学学报(工学版), 2021, 55(2): 330-337. CUI Yunliang, LI Zhiyuan, WEI Gang, et al. Pre-protection effect of underground comprehensive pipe gallery over proposed tunnel[J]. Journal of Zhejiang University(Engineering Science), 2021, 55(2): 330-337. [6] 刘平, 王洪涛, 刘泉声, 等. 基于Hoek-Brown强度参数的地铁隧道下穿既有管廊塌落上限分析[J]. 应用基础与工程科学学报, 2023, 31(5): 1205-1218. LIU Ping, WANG Hongtao, LIU Quansheng, et al. Upper limit analysis of tunnel collapse under existing pipe gallery based on Hoek-Brown strength parameter[J]. Journal of Basic Science and Engineering, 2023, 31(5): 1205-1218. [7] 杨俊龙. 盾构隧道下穿人防通道数值分析及现场测试研究[J]. 中国市政工程, 2019(2): 93-96. YANG Junlong. Numerical analysis & field test research of shield tunnel underpass civil defense passageway[J]. China Municipal Engineering, 2019(2): 93-96. [8] LIANG R Z, XIA T D, HONG Y, et al. Effects of above-crossing tunnelling on the existing shield tunnels[J]. Tunnelling and Underground Space Technology, 2016, 58: 159-176. [9] LIN X T, ZENG H, WANG X T, et al. Super-large-diameter shield tunnel undercrossing an intercity railway with oblique angle: centrifuge test and numerical analysis[J]. Journal of Rock Mechanics and Geotechnical Engineering, 2025, 17(5): 2741-2757. [10] 檀俊坤, 殷爱国, 乔世范, 等. 曲线段双护盾TBM隧道上穿既有隧道变形规律分析[J]. 铁道科学与工程学报, 2026, 23(1): 208-222. TAN Junkun, YIN Aiguo, QIAO Shifan, et al. Deformation law of double shield TBM tunnel on curved sections passing through existing tunnels[J]. Journal of Railway Science and Engineering, 2026, 23(1): 208-222. [11] 刘波, 李烃, 韩彦辉. 城市地下空间盾构隧道穿越工程研究综述[J]. 施工技术(中英文), 2024, 53(17): 35-46. LIU Bo, LI Ting, HAN Yanhui. Review of research on shield tunnel crossing engineering in urban underground spaces[J]. Construction Technology, 2024, 53(17): 35-46. [12] 滕丽. 盾构穿越地下障碍物的试验研究[J]. 建筑机械化, 2011, 32(10): 89-91. TENG Li. Experimental studies on shield through underground obstacles[J]. Construction Mechanization, 2011, 32(10): 89-91. [13] 王飞, 袁大军, 董朝文, 等. 盾构直接切削大直径钢筋混凝土桩基试验研究[J]. 岩石力学与工程学报, 2013, 32(12): 2566-2574. WANG Fei, YUAN Dajun, DONG Chaowen, et al. Test study of shield cutting large-diameter reinforced concrete piles directly[J]. Chinese Journal of Rock Mechanics and Engineering, 2013, 32(12): 2566-2574. [14] 王飞, 袁大军, 董朝文, 等. 盾构直接切削大直径群桩的刀具配置研究[J]. 土木工程学报, 2013, 46(12): 127-135. WANG Fei, YUAN Dajun, DONG Chaowen, etal. Study on cutter configuration for directly shield cutting of large-diameter piles[J]. China Civil Engineering Journal, 2013, 46(12): 127-135. [15] 袁大军, 王飞, 董朝文, 等. 盾构切削大直径钢筋混凝土桩基新型刀具研究[J]. 中国公路学报, 2016, 29(3): 89-97. YUAN Dajun, WANG Fei, DONG Chaowen, et al. Study on new-style cutter for shield cutting large-diameter reinforced concrete pile[J]. China Journal of Highway and Transport, 2016, 29(3): 89-97. [16] 杜闯东, 张杰, 唐纵雄. 盾构直接切削桩基施工关键技术[J]. 隧道建设(中英文), 2019, 39(10): 1666-1677. DU Chuangdong, ZHANG Jie, TANG Zongxiong. Key technologies of shield direct cutting pile foundation[J]. Tunnel Construction, 2019, 39(10): 1666-1677. [17] 李宏波. 盾构直接切削φ25 mm主筋钢筋混凝土桩基可行性研究[J]. 隧道建设(中英文), 2020, 40(12): 1808-1816. LI Hongbo. Feasibility study on direct cutting of reinforced concrete pile foundation with φ25 mm main reinforced bar by shield[J]. Tunnel Construction, 2020, 40(12): 1808-1816. [18] 王哲, 吴淑伟, 姚王晶, 等. 盾构穿越既有桥梁桩基磨桩技术的研究[J]. 岩土工程学报, 2020, 42(1): 117-125. WANG Zhe, WU Shuwei, YAO Wangjing, et al. Grinding pile technology of shield tunnels crosssing pile foundation of existing bridges[J]. Chinese Journal of Geotechnical Engineering, 2020, 42(1): 117-125. [19] 李兴高, 崔伦萌, 方应冉, 等. 盾构切桩过程中刀盘荷载变化特征[J]. 土木工程学报, 2024, 57(增刊1): 59-64. LI Xinggao, CUI Lunmeng, FANG Yingran, et al. Research on cutterhead load variation characteristics during shield cutting pile process[J]. China Civil Engineering Journal, 2024, 57(Suppl.1): 59-64. [20] 沈翔, 张海彬, 段锴, 等. 多滚刀切削混凝土桩基相互作用特性及扰动影响研究[J]. 隧道与地下工程灾害防治, 2025, 7(2): 21-30. SHEN Xiang, ZHANG Haibin, DUAN Kai, et al. Study on interaction mechanism and disturbance effect of multi disc cutter cutting concrete pile foundation[J]. Hazard Control in Tunnelling and Underground Engineering, 2025, 7(2): 21-30. [21] 陈海丰, 袁大军, 王飞, 等. 盾构直接切削大直径桩基的掘削参数研究[J]. 土木工程学报, 2016, 49(10): 103-109. CHEN Haifeng, YUAN Dajun, WANG Fei, et al. Study on shield cutting parameters when cutting big diameter piles[J]. China Civil Engineering Journal, 2016, 49(10): 103-109. [22] 杜欣, 黄雪梅, 郝岩, 等. 盾构切削混凝土桥桩刀盘荷载分析[J]. 地下空间与工程学报, 2021, 17(6): 1742-1750. DU Xin, HUANG Xuemei, HAO Yan, et al. Analysis on cutterhead load in shield cutting concrete bridge pile[J]. Chinese Journal of Underground Space and Engineering, 2021, 17(6): 1742-1750. [23] LIU B, LI T, HAN Y H, et al. The problem of wedge indenter with flat-rounded bottom indenting half-plane elastic body[J]. International Journal of Applied Mechanics, 2022, 14(3): 2250010. [24] 牟政, 李福林. 基于FEM-DEM耦合的盾构掘进参数对滚刀切削钢筋混凝土效果的影响研究[J]. 现代隧道技术, 2025, 62(1): 147-156. MU Zheng, LI Fulin. Study on the effect of shield tunnelling parameters on cutting performance of reinforced concrete based on FEM-DEM coupling method[J]. Modern Tunnelling Technology, 2025, 62(1): 147-156. [25] HENTZ S, DAUDEVILLE L, DONZÉ F V. Discrete element modeling of a reinforced concrete structure[J]. Journal of the Mechanical Behavior of Materials, 2009, 19(4): 249-258.