Hazard Control in Tunnelling and Underground Engineering  2020, Vol. 2 Issue (1): 53-60    DOI:
Current Issue | Archive | Adv Search |
Method for defining stress release rate caused by overcutting of cutter head of shield tunnel
JIN Zhihao1, LIU Tao2, HUANG Xufeng2, WANG Kezhong1*
1. School of Civil Engineering and Architecture, Zhejiang University of Technology, Hangzhou 310023, Zhejiang, China;
2. The Third Engineering Co., Ltd., China Railway Seventh Group, Xi'an 710043, Shaanxi, China
Website Copyright © Hazard Control in Tunnelling and Underground Engineering.
Address: The Editorial Office of "Hazard Control in Tunneling and Underground Engineering" B733, Shandong University Central Campus, 27 Shanda South Road, Jinan City, Shandong Province, China: 250100 Tel: 0531-88366735 E-mail: tunnel@sdu.edu.cn
Powered by Beijing Magtech Co. Ltd