Hazard Control in Tunnelling and Underground Engineering  2021, Vol. 3 Issue (1): 82-91    DOI: 10.19952/j.cnki.2096-5052.2021.01.10
Research Article Current Issue | Archive | Adv Search |
The comprehensive remediation plan and construction technology of tunnel crossing underground river chamber in Karst area
CHEN Jian1, HUANG Ze1, XIE Yipeng2, YANG Junsheng2, PENG Yuyang2
1. The Forth Engineering Co., Ltd., China Railway No.5 Group, Shaoguan 512031, Guangdong, China;
2. School of Civil Engineering, Central South University, Changsha 410075, Hunan, China
Website Copyright © Hazard Control in Tunnelling and Underground Engineering.
Address: The Editorial Office of "Hazard Control in Tunneling and Underground Engineering" B733, Shandong University Central Campus, 27 Shanda South Road, Jinan City, Shandong Province, China: 250100 Tel: 0531-88366735 E-mail: tunnel@sdu.edu.cn
Powered by Beijing Magtech Co. Ltd