Hazard Control in Tunnelling and Underground Engineering  2022, Vol. 4 Issue (1): 78-85    DOI: 10.19952/j.cnki.2096-5052.2022.01.10
Research Article Current Issue | Archive | Adv Search |
Advance stress release construction technology of small pilot tunnel in TBM strong rock burst tunneling section
ZHAO Yi
China Railway Tunnel Stock Co., Ltd., Zhengzhou 450000, Henan, China
Website Copyright © Hazard Control in Tunnelling and Underground Engineering.
Address: The Editorial Office of "Hazard Control in Tunneling and Underground Engineering" B733, Shandong University Central Campus, 27 Shanda South Road, Jinan City, Shandong Province, China: 250100 Tel: 0531-88366735 E-mail: tunnel@sdu.edu.cn
Powered by Beijing Magtech Co. Ltd