Hazard Control in Tunnelling and Underground Engineering
Current Issue | Archive | Adv Search |
Parameter inversion of modified cam-clay constitutive model based on an improved sparrow search algorithm
Song Laifu1,Yin Xiangtao1,Chen Jianan1,Wang Yicun2*,Hu Jiaqing1
(1.College of Architecture and Civil Engineering, Wenzhou University, Wenzhou 325035, Zhejiang, China;
2. Beijing Urban Construction Exploration & Surveying Design Research Institute Co., Ltd., Beijing 100084, China)
Website Copyright © Hazard Control in Tunnelling and Underground Engineering.
Address: The Editorial Office of "Hazard Control in Tunneling and Underground Engineering" B733, Shandong University Central Campus, 27 Shanda South Road, Jinan City, Shandong Province, China: 250100 Tel: 0531-88366735 E-mail: tunnel@sdu.edu.cn
Powered by Beijing Magtech Co. Ltd