Influence mechanism of tunnel excavation on adjacent fault based on FDM-DEM coupling method
YU Haitao1, CHEN Zhiwei2
1. Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University, Shanghai 200092, China; 2. Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China
Abstract: Tunneling usually causes the dislocation of adjacent faults and further induces disasters such as earthquakes, but the physical mechanism is still not clear. A numerical model of near fault tunnel excavation was established by coupling mechanics of continuous media with mechanics of discrete medium. The discrete element method(DEM)was used to simulate the meso-mechanical behavior of the fault fracture zone, and the finite difference method(FDM)was used to describe the macro-dynamic characteristics of the upper and lower walls of the fault. Based on the multi-factor influence analysis, the physical mechanism of the near-fault dislocation induced by tunnel excavation was explored. The analysis results showed that the fault dislocation caused by tunnel excavation could be divided into four stages: incubation stage, acceleration stage, slowing stage and stability stage. The interaction between the fracture zone and the upper and lower walls was weak, and the rock mass deformation caused by excavation was difficult to propagate through the fracture zone to the other side. The discontinuity and disharmony of the deformation of the upper and lower walls were the main reasons for the fault dislocation. When the tunnel was located in the hanging wall, the fault displacement above the tunnel depth was positive, showing the form of positive fault, while the fault displacement below the tunnel depth was negative, showing the form of reverse fault. When the tunnel was located in the footwall, the result was opposite. The farther the tunnel was from the fault, the smaller the fault displacement caused by tunnel excavation was, and the fault displacement at different depths finally approached to 0. The increase of distance might also lead to the change of fault dislocation form below the tunnel depth. When the tunnel was located in the hanging wall, the fault displacement decreased with the increase of dip angle. When the tunnel was located at the footwall, the fault displacement above the buried depth of the tunnel increased with the increase of dip angle. The fault displacement under the buried depth of the tunnel decreased continuously. The fault displacement at the buried depth of the tunnel first decreased to 0 with the increase of dip angle, and then the dislocation form changed, and the displacement continued to increase.
禹海涛, 陈志伟. 基于连续-离散耦合方法的隧道开挖对近断层的影响机制研究[J]. 隧道与地下工程灾害防治, 2021, 3(3): 20-28.
YU Haitao, CHEN Zhiwei. Influence mechanism of tunnel excavation on adjacent fault based on FDM-DEM coupling method. Hazard Control in Tunnelling and Underground Engineering, 2021, 3(3): 20-28.
张广泽,邓建辉,王栋,等.隧道围岩构造软岩大变形发生机理及分级方法[J].工程科学与技术, 2021,53(1):1-12. ZHANG Guangze, DENG Jianhui, WANG Dong, et al. Mechanism and classification of tectonic-induced large deformation of soft rock tunnels[J]. Advanced Engineering Sciences, 2021, 53(1):1-12.
[2]
李建旺,冯仕文,周喻.隧道下穿采空区施工围岩灾变演化的力学机制[J].中南大学学报(自然科学版), 2021,52(2):543-554. LI Jianwang, FENG Shiwen, ZHOU Yu. Mechanical mechanism of surrounding rock catastrophe evolution during construction of tunnel under goaf[J]. Journal of Central South University(Science and Technology), 2021, 52(2):543-554.
[3]
MANOUCHEHRIAN A, CAI M. Numerical modeling of rockburst near fault zones in deep tunnels[J]. Tunnelling and Underground Space Technology, 2018, 80:164-180.
[4]
GAO F, KANG H, LI J. Numerical simulation of fault-slip rockbursts using the distinct element method[J]. Tunnelling and Underground Space Technology, 2021, 110:103805.
[5]
周宗青,李利平,石少帅,等. 隧道突涌水机制与渗透破坏灾变过程模拟研究[J]. 岩土力学, 2020,41(11):3621-3631. ZHOU Zongqing, LI Liping, SHI Shaoshuai, et al. Study on tunnel water inrush mechanism and simulation of seepage failure process[J]. Rock and Soil Mechanics, 2020, 41(11):3621-3631.
[6]
QUICK H, MICHAEL J, BERGMEISTER K, et al. Aicha-mauls on the brenner base tunnel-status of the works and results[J]. Geomechanics and Tunnelling, 2010, 3(5): 520-533.
[7]
HUSEN S, KISSLING E, DESCHWANDEN A V. Induced seismicity during the construction of the Gotthard Base Tunnel, Switzerland: hypocenter locations and source dimensions[J]. Journal of Seismology, 2012, 16(2):195-213.
[8]
赵海军,马凤山,李国庆,等. 断层上下盘开挖引起岩移的断层效应[J]. 岩土工程学报, 2008(9):1372-1375. ZHAO Haijun, MA Fengshan, LI Guoqing, et al. Fault effect due to underground excavation in hangingwalls and footwalls of faults[J]. Chinese Journal of Geotechnical Engineering, 2008(9):1372-1375.
[9]
李忠华,包思远,尹万蕾,等. 巨型逆冲断层开采扰动活化条件研究[J].采矿与安全工程学报, 2019,36(4):762-767. LI Zhonghua, BAO Siyuan, YIN Wanlei, et al. Study on the activation condition of giant thrust fault under mining disturbance[J]. Journal of Mining & Safety Engineering, 2019, 36(4):762-767.
[10]
KHADEMIAN Z. Studies of seismicity generated by unstable failures around circular excavations[C] //50th US Rock Mechanics/Geomechanics Symposium. Houston, US: American rock mechanics association, 2016.
[11]
RINALDI A P, URPI L. Fault reactivation induced by tunneling activity in clay material: hints from numerical modeling [J]. Tunnelling and Underground Space Technology, 2020, 102:103453.