Hazard Control in Tunnelling and Underground Engineering  2021, Vol. 3 Issue (2): 33-42    DOI: 10.19952/j.cnki.2096-5052.2021.02.04
Research Article Current Issue | Archive | Adv Search |
Rapid construction of three-lane highway rock-soil mixed tunnel with single-side heading method
QIAO Xiong1, NI Weilin1, LUO Weibin2*, LIU Wengao1
1. School of Civil Engineering, Lanzhou University of Technology, Lanzhou 730050, Gansu, China;
2. Gansu Tunnel Engineering Technology Research Center, Gansu Road and Bridge Construction Group Co., Ltd., Lanzhou 730050, Gansu, China
Website Copyright © Hazard Control in Tunnelling and Underground Engineering.
Address: The Editorial Office of "Hazard Control in Tunneling and Underground Engineering" B733, Shandong University Central Campus, 27 Shanda South Road, Jinan City, Shandong Province, China: 250100 Tel: 0531-88366735 E-mail: tunnel@sdu.edu.cn
Powered by Beijing Magtech Co. Ltd