Hazard Control in Tunnelling and Underground Engineering  2021, Vol. 3 Issue (2): 49-60    DOI: 10.19952/j.cnki.2096-5052.2021.02.06
Research Article Current Issue | Archive | Adv Search |
Reinforcement effect and actual measurement analysis of new shield tunnel crossing existing metro tunnel with shed pre-supporting method
JIANG Yexiang1, ZHOU Qihui2, YANG Yijun1, SU Fengyang1, LIU Zunjing2, ZHANG Xiao3, DING Zhi3
1. Hangzhou Metro Group Co., Ltd., Hangzhou 310017, Zhejiang, China;
2. PowerChina Huadong Engineering Co., Ltd., Hangzhou 311122, Zhejiang, China;
3. Department of Civil Engineering, Zhejiang University City College, Hangzhou 310015, Zhejiang, China
Website Copyright © Hazard Control in Tunnelling and Underground Engineering.
Address: The Editorial Office of "Hazard Control in Tunneling and Underground Engineering" B733, Shandong University Central Campus, 27 Shanda South Road, Jinan City, Shandong Province, China: 250100 Tel: 0531-88366735 E-mail: tunnel@sdu.edu.cn
Powered by Beijing Magtech Co. Ltd