Hazard Control in Tunnelling and Underground Engineering  2022, Vol. 4 Issue (2): 39-48    DOI: 10.19952/j.cnki.2096-5052.2022.02.05
Research Article Current Issue | Archive | Adv Search |
Research on construction parameters of double side heading method considering multiple factors
LI Xiangbing1, LIANG Bo1,2*, LU Siyuan1
1. College of Civil Engineering, Chongqing Jiaotong University, Chongqing 400074, China;
2. State Key Laboratory of Mountain and Bridge Engineering, Chongqing Jiaotong University, Chongqing 400074, China
Website Copyright © Hazard Control in Tunnelling and Underground Engineering.
Address: The Editorial Office of "Hazard Control in Tunneling and Underground Engineering" B733, Shandong University Central Campus, 27 Shanda South Road, Jinan City, Shandong Province, China: 250100 Tel: 0531-88366735 E-mail: tunnel@sdu.edu.cn
Powered by Beijing Magtech Co. Ltd