Hazard Control in Tunnelling and Underground Engineering  2022, Vol. 4 Issue (2): 81-89    DOI: 10.19952/j.cnki.2096-5052.2022.02.10
Research Article Current Issue | Archive | Adv Search |
Simulation of surrounding rock stability of excavation and construction of reserve center rock pillar in the dome of large-span underground tank chamber
ZHAO Wenqiang1, ZHOU Jianwei2, YUAN Zhaoting3, WU Mingxiang4*, JIANG Yalong4, GENG Daxin4, LIU Changhong3
1. China Railway First Survey and Design Institute Group Co., Ltd., Xi'an 710043, Shaanxi, China;
2. Eastern Theater Air Force Design Institute, Nanjing 210000, Jiangsu, China;
3. Nanchang Railway Engineering Co., Ltd., China Railway 24th Bureau Group, Nanchang 330000, Jiangxi, China;
4. School of Civil Engineering and Architecture, East China Jiaotong University, Nanchang 330013, Jiangxi, China
Website Copyright © Hazard Control in Tunnelling and Underground Engineering.
Address: The Editorial Office of "Hazard Control in Tunneling and Underground Engineering" B733, Shandong University Central Campus, 27 Shanda South Road, Jinan City, Shandong Province, China: 250100 Tel: 0531-88366735 E-mail: tunnel@sdu.edu.cn
Powered by Beijing Magtech Co. Ltd