Hazard Control in Tunnelling and Underground Engineering  2022, Vol. 4 Issue (3): 92-98    DOI: 10.19952/j.cnki.2096-5052.2022.03.07
Research Article Current Issue | Archive | Adv Search |
Formation stability analysis during the opening operation of the box pipe jacking
LIU Wei, YU Miao, WU Yinlong, SHI Peixin, WU Ben
School of Rail Transportation, Soochow University, Suzhou 215000, Jiangsu, China
Website Copyright © Hazard Control in Tunnelling and Underground Engineering.
Address: The Editorial Office of "Hazard Control in Tunneling and Underground Engineering" B733, Shandong University Central Campus, 27 Shanda South Road, Jinan City, Shandong Province, China: 250100 Tel: 0531-88366735 E-mail: tunnel@sdu.edu.cn
Powered by Beijing Magtech Co. Ltd