Hazard Control in Tunnelling and Underground Engineering  2024, Vol. 6 Issue (3): 1-11    DOI: 10.19952/j.cnki.2096-5052.2024.03.01
Research Article Current Issue | Archive | Adv Search |
Case study on the overall stability of foundation pit slope with weak interlayer
LI Lianxiang1,2,3, LÜ Guiqing4, ZHANG Shangru1,2, ZHAO Yongxin1,2, WANG Chuhan1,2
1. School of Civil Engineering, Shandong University, Jinan 250061, Shandong, China;
2. Foundation Pit and Deep Foundation Engineering Research Center, Shandong University, Jinan 250061, Shandong, China;
3. Shandong High-Xin Geotechnical Engineering Co., Ltd., Jinan 250102, Shandong, China;
4. Jinan City Urban and Rural Construction Development Service Center, Jinan 250014, Shandong, China
Website Copyright © Hazard Control in Tunnelling and Underground Engineering.
Address: The Editorial Office of "Hazard Control in Tunneling and Underground Engineering" B733, Shandong University Central Campus, 27 Shanda South Road, Jinan City, Shandong Province, China: 250100 Tel: 0531-88366735 E-mail: tunnel@sdu.edu.cn
Powered by Beijing Magtech Co. Ltd