Hazard Control in Tunnelling and Underground Engineering  2024, Vol. 6 Issue (3): 60-72    DOI: 10.19952/j.cnki.2096-5052.2024.03.07
Research Article Current Issue | Archive | Adv Search |
Failure mechanism of tailrace surge chamber in Jinchuan Hydropower Station based on microseismic monitoring and DFN simulation
PI Jintian1, XU Nuwen1*, ZHANG Fengshou2, MAO Haoyu1, ZHOU Xiang1,3, LI Huailiang4, BO Wu5
1. State Key Laboratory of Hydraulics and Mountain River Engineering, Sichuan University, Chengdu 610065, Sichuan, China;
2. Department of Geotechnical Engineering, College of Civil Engineering, Tongji University, Shanghai 200092, China;
3. Guodian Dadu River Basin Hydropower Development Co., Ltd., Chengdu 610041, Sichuan, China;
4. State Key Laboratory of Geohazard and Prevention and Geoenvirenment Protection, Chengdu University of Technology, Chengdu 610059, Sichuan, China;
5. School of Engineering, Tibet University, Lasa 850000, Xizang, China
Website Copyright © Hazard Control in Tunnelling and Underground Engineering.
Address: The Editorial Office of "Hazard Control in Tunneling and Underground Engineering" B733, Shandong University Central Campus, 27 Shanda South Road, Jinan City, Shandong Province, China: 250100 Tel: 0531-88366735 E-mail: tunnel@sdu.edu.cn
Powered by Beijing Magtech Co. Ltd