Hazard Control in Tunnelling and Underground Engineering  2025, Vol. 7 Issue (3): 37-46    DOI: 10.19952/j.cnki.2096-5052.2025.03.03
Research Article Current Issue | Archive | Adv Search |
Automated design methodology for 3D blasting schemes in rock shafts
ZHAO Gaofeng1, XIE Xinzhe1, HAO Yimin2, LIU Yanlong3, LI Jieyong3, MA Hongsu4, WEI Xindong1*
1. State Key Laboratory of Hydraulic Engineering Intelligent Construction and Operation, Tianjin University, Tianjin 300350, China;
2. Yajiang Clean Energy Development Co., Ltd., Beijing 100038, China;
3. China Railway 23rd Bureau Group Co., Ltd., Chengdu 610072, Sichuan, China;
4. Beijing Research Institute of Uranium Geology, Beijing 100029, China
Website Copyright © Hazard Control in Tunnelling and Underground Engineering.
Address: The Editorial Office of "Hazard Control in Tunneling and Underground Engineering" B733, Shandong University Central Campus, 27 Shanda South Road, Jinan City, Shandong Province, China: 250100 Tel: 0531-88366735 E-mail: tunnel@sdu.edu.cn
Powered by Beijing Magtech Co. Ltd