Hazard Control in Tunnelling and Underground Engineering  2026, Vol. 8 Issue (1): 88-98    DOI: 10.19952/j.cnki.2096-5052.2026.01.08
Research Article Current Issue | Archive | Adv Search |
Time series prediction of shield construction ground settlement based on the fusion method of VMD-CNN-BiLSTM model and attention mechanism
GUO Junhao1, YAN Mengyao1, LI Jie1, ZHOU Lei1, ZHAO Xing1, HUANG Fu2, REN Ziheng2
1. China Railway 16th Bureau Group Corporation Limited, Beijing 100018, China;
2. School of Civil and Environmental Engineering, Changsha University of Science &
Technology, Changsha 410114, Hunan, China
Website Copyright © Hazard Control in Tunnelling and Underground Engineering.
Address: The Editorial Office of "Hazard Control in Tunneling and Underground Engineering" B733, Shandong University Central Campus, 27 Shanda South Road, Jinan City, Shandong Province, China: 250100 Tel: 0531-88366735 E-mail: tunnel@sdu.edu.cn
Powered by Beijing Magtech Co. Ltd