Hazard Control in Tunnelling and Underground Engineering  2020, Vol. 2 Issue (1): 20-33    DOI:
Current Issue | Archive | Adv Search |
Research on disaster caused by evolution of large karst caves in the upper part of an operating high-speed railway tunnel and its disposal scheme
WANG Lichuan1,2, MA Xiangfeng2, WANG Huawu3, YANG Ling4, YAO Yunxiao5, GONG Lun2*, WANG Qiu6, LIU Ziqi7, FAN Yongjie1, ZHOU Baoan1
1. China Railway Chengdu Bureau Group Co., Ltd., Chengdu 610082, Sichuan, China;
2. School of Civil Engineering, Southwest Jiaotong University/Key Laboratory of Traffic Tunnel Engineering, Ministry of Education, Chengdu 610031, Sichuan, China;
3. China Railway Kunming Bureau Group Co., Ltd., Kunming 650011, Yunnan, China;
4. China Railway Beijing Engineering Bureau Group, Beijing 102308, China;
5. Yuqian Railway Co., Ltd., Chongqing 404100, China;
6. Chongqing Survey and Design Research Institute Co., Ltd., China Railway Second Institute, Chongqing 400023, China;
7. Karst Research Institute, Guizhou Normal University, Guiyang 550001, Guizhou, China
Website Copyright © Hazard Control in Tunnelling and Underground Engineering.
Address: The Editorial Office of "Hazard Control in Tunneling and Underground Engineering" B733, Shandong University Central Campus, 27 Shanda South Road, Jinan City, Shandong Province, China: 250100 Tel: 0531-88366735 E-mail: tunnel@sdu.edu.cn
Powered by Beijing Magtech Co. Ltd