Hazard Control in Tunnelling and Underground Engineering  2020, Vol. 2 Issue (1): 91-96    DOI:
Current Issue | Archive | Adv Search |
Calculation of water inflow of suspended dewatering foundation pit with source-sink method
HE Chong, JIN Yunyun
Shanghai Shenyuan Geotechnical Engineering Co., Ltd., Shanghai 200011, China
Download: PDF (1676KB) 
Export: BibTeX | EndNote (RIS)      
Abstract  Based on the large well method, through the in-depth study of the influence mechanism of the suspended water stop curtain, combined with the groundwater seepage theory, the theoretical calculation formula of the foundation pit water inflow under the condition of suspended dewatering was derived. Through the numerical calculation of the engineering example, this method had high precision, and the suspended dewatering condition was efficiently and accurately estimated with the limited known conditions in the early stage of the foundation pit, therefore the current foundation pit dewatering design theory could be improved and perfected.
Key wordssuspended dewatering      water inflow of foundation pit      large well method      source-sink method      pumping test     
Published: 07 July 2020
ZTFLH:  TU46  
Service
E-mail this article
Add to my bookshelf
Add to citation manager
E-mail Alert
RSS
Articles by authors
HE Chong
JIN Yunyun
Cite this article:   
HE Chong,JIN Yunyun. Calculation of water inflow of suspended dewatering foundation pit with source-sink method[J]. Hazard Control in Tunnelling and Underground Engineering, 2020, 2(1): 91-96.
URL:  
http://tunnel.sdujournals.com/EN/     OR     http://tunnel.sdujournals.com/EN/Y2020/V2/I1/91
Website Copyright © Hazard Control in Tunnelling and Underground Engineering.
Address: The Editorial Office of "Hazard Control in Tunneling and Underground Engineering" B733, Shandong University Central Campus, 27 Shanda South Road, Jinan City, Shandong Province, China: 250100 Tel: 0531-88366735 E-mail: tunnel@sdu.edu.cn
Powered by Beijing Magtech Co. Ltd
51La