Hazard Control in Tunnelling and Underground Engineering  2020, Vol. 2 Issue (2): 41-46    DOI:
Current Issue | Archive | Adv Search |
Simulation and prediction of TBM tunnel construction process coupling geological model
XU Chen1, LIU Xiaoli1*, ZHANG Lujun2, MAO Zongyuan1,3, ZHOU Jianjun4,5, WANG Sijing1,6
1. State Key Laboratory of Hydroscience and Engineering, Tsinghua University, Beijing 100084, China;
2. Qilu Transportation Materials Technology Development Co., Ltd., Jinan 250014, Shandong, China;
3. China Academy of Building Research, Beijing 100013, China;
4. State Key Laboratory of Shield Machine and Boring Technology, Zhengzhou 450001, Henan, China;
5. China Railway Tunnel Group Co., Ltd., Guangzhou 511458, Guangdong, China;
6. Institute of Geology and Geophysics, Chinese Academy of Sciences, Beijing 100029, China
Website Copyright © Hazard Control in Tunnelling and Underground Engineering.
Address: The Editorial Office of "Hazard Control in Tunneling and Underground Engineering" B733, Shandong University Central Campus, 27 Shanda South Road, Jinan City, Shandong Province, China: 250100 Tel: 0531-88366735 E-mail: tunnel@sdu.edu.cn
Powered by Beijing Magtech Co. Ltd