Abstract  With development of railway transportation, shield tunneling technology has been widely used. As a key component of shield tunneling, the working efficiency and failure form of hob were directly related to the geological conditions and had an important influence on construction schedule and safety. Based on a subway tunneling project, its geology related was analyzed firstly, then the failure types and corresponding causes of the disc cutters were also explained. Finally, a brief discussion was given about the material properties of disc cutters. The results showed that the failure forms were mainly partial grinding, edge curl, fracture of disc cutter ring, cutter ring off, fracture of cutter shaft.
Key wordsshield machine      disc cutter      geological condition      failure type      material properties     
Published: 04 November 2020
ZTFLH:  U455.3  
Service
E-mail this article
Add to my bookshelf
Add to citation manager
E-mail Alert
RSS
Articles by authors
LU Qingliang
YUAN Naiqiang
Cite this article:   
LU Qingliang,YUAN Naiqiang. Failure analysis of the disc cutters of TBM in a subway project[J]. Hazard Control in Tunnelling and Underground Engineering, 2020, 2(2): 92-96.
URL:  
http://tunnel.sdujournals.com/EN/     OR     http://tunnel.sdujournals.com/EN/Y2020/V2/I2/92
Website Copyright © Hazard Control in Tunnelling and Underground Engineering.
Address: The Editorial Office of "Hazard Control in Tunneling and Underground Engineering" B733, Shandong University Central Campus, 27 Shanda South Road, Jinan City, Shandong Province, China: 250100 Tel: 0531-88366735 E-mail: tunnel@sdu.edu.cn
Powered by Beijing Magtech Co. Ltd
51La