Hazard Control in Tunnelling and Underground Engineering  2025, Vol. 7 Issue (2): 1-12    DOI: 10.19952/j.cnki.2096-5052.2025.02.01
researchs Current Issue | Archive | Adv Search |
Application of the steel pipe pile arch cover method in large-span underground metro stations in weak and fragmented rock strata
WANG Lichuan1,2, HE Weiguo3, ZHANG Junru2,4*, WU Hongbin1,5, JIANG Xinqiang1,5, ZHANG Huijian2,4, WANG Wen6, HUANG Linxiang1,7
1. China Railway 18th Bureau Group Co., Ltd., Tianjin 300222, China;
2. School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, Sichuan, China;
3. China Railway Sixth Survey and Design Institute Group Co., Ltd., Tianjin 300133, China;
4. Key Laboratory of Transportation Tunnel Engineering(Ministry of Education), Southwest Jiaotong University, Chengdu 610031, Sichuan, China;
5. The 4th Engineering Co., Ltd. of China Railway 18th Bureau Group, Tianjin 300350, China;
6. China Communications Third Highway Engineering Bureau Co., Ltd., Beijing 100010, China;
7. Municipal Engineering Co., Ltd. of China Railway 18th Bureau Group, Tianjin 300222, China
Website Copyright © Hazard Control in Tunnelling and Underground Engineering.
Address: The Editorial Office of "Hazard Control in Tunneling and Underground Engineering" B733, Shandong University Central Campus, 27 Shanda South Road, Jinan City, Shandong Province, China: 250100 Tel: 0531-88366735 E-mail: tunnel@sdu.edu.cn
Powered by Beijing Magtech Co. Ltd