Hazard Control in Tunnelling and Underground Engineering  2019, Vol. 1 Issue (2): 114-123    DOI:
Current Issue | Archive | Adv Search |
Settlement control method for shallow foundation tied arch bridge lying over earth-pressure balance shield construction
WEN Faqing
China Railway 18th Bureau Group Ltd., Tianjin 300222, China
Website Copyright © Hazard Control in Tunnelling and Underground Engineering.
Address: The Editorial Office of "Hazard Control in Tunneling and Underground Engineering" B733, Shandong University Central Campus, 27 Shanda South Road, Jinan City, Shandong Province, China: 250100 Tel: 0531-88366735 E-mail: tunnel@sdu.edu.cn
Powered by Beijing Magtech Co. Ltd