Hazard Control in Tunnelling and Underground Engineering  2026, Vol. 8 Issue (3): 1-9    DOI: 10.19952/j.cnki.2096-5052.2026.03.01
Current Issue | Archive | Adv Search |
Key design techniques for highway-railway combined shield tunnels in the middle and lower reaches of the Yellow River
Sun Wenhao1,2, Xu Weimin3, He Yingdao1,2, Li Penglin4, Zhang Jincheng5, Zhang Liangliang1,2*
1.China Railway Siyuan Survey and Design Group Co., Ltd., Wuhan 430063, Hubei, China;
2. National-Local Joint Engineering Research Center of Underwater Tunnelling Technology, Wuhan 430063, Hubei, China;
3. Jinan City Construction Group Co., Ltd., Jinan 250014, Shandong, China;
4. China Railway 14th Bureau Group Large Shield Engineering Co., Ltd., Nanjing 211899, Jiangsu, China;
5. Communist Youth League Jinan Municipal Committee, Jinan 250021, Shandong, China
Website Copyright © Hazard Control in Tunnelling and Underground Engineering.
Address: The Editorial Office of "Hazard Control in Tunneling and Underground Engineering" B733, Shandong University Central Campus, 27 Shanda South Road, Jinan City, Shandong Province, China: 250100 Tel: 0531-88366735 E-mail: tunnel@sdu.edu.cn
Powered by Beijing Magtech Co. Ltd