Hazard Control in Tunnelling and Underground Engineering  2026, Vol. 8 Issue (3): 102-114    DOI: 10.19952/j.cnki.2096-5052.2026.03.10
Current Issue | Archive | Adv Search |
Study on long-term settlement of shield tunnels parallelly undercutting existing highway tunnels with variable spacing under cyclic dynamic loading
He Jiacheng1,2, Zhu Chi3, Fu Jinyang3*, Sun Qianhui3, Li Yanan4
1. China Railway Siyuan Survey and Design Group Co., Ltd., Wuhan 430063, Hubei, China;
2. National and Local Joint Engineering Research Center for Underwater Tunnel Technology, Wuhan 430063, Hubei, China;
3. School of Civil Engineering, Central South University, Changsha 410075, Hunan, China;
4. Yellow River Engineering Consulting Co., Ltd., Zhengzhou 450003, Henan, China
Website Copyright © Hazard Control in Tunnelling and Underground Engineering.
Address: The Editorial Office of "Hazard Control in Tunneling and Underground Engineering" B733, Shandong University Central Campus, 27 Shanda South Road, Jinan City, Shandong Province, China: 250100 Tel: 0531-88366735 E-mail: tunnel@sdu.edu.cn
Powered by Beijing Magtech Co. Ltd