Hazard Control in Tunnelling and Underground Engineering  2022, Vol. 4 Issue (2): 66-72    DOI: 10.19952/j.cnki.2096-5052.2022.02.08
Research Article Current Issue | Archive | Adv Search |
Experimental research on static response of ground penetrating ultra shallow-buried shield tunnel without working shaft
CHEN Fengjun1, ZONG Junliang2, WANG Qi3, YU Haitao3*
1. Shanghai Construction Group Co., Ltd., Shanghai 200080, China;
2. Shanghai Huangpu River Crossing Facility Investment Construction Development Co., Ltd., Shanghai 200003, China;
3. Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China
Website Copyright © Hazard Control in Tunnelling and Underground Engineering.
Address: The Editorial Office of "Hazard Control in Tunneling and Underground Engineering" B733, Shandong University Central Campus, 27 Shanda South Road, Jinan City, Shandong Province, China: 250100 Tel: 0531-88366735 E-mail: tunnel@sdu.edu.cn
Powered by Beijing Magtech Co. Ltd