Hazard Control in Tunnelling and Underground Engineering  2023, Vol. 5 Issue (2): 33-41    DOI: 10.19952/j.cnki.2096-5052.2023.02.03
Research Article Current Issue | Archive | Adv Search |
Coupling analysis between prestress loss of anchor cables and creep of rocks
YANG Wendong1, LIU Chuntian1, ZHANG Xiang1, CHEN Xiaopeng2, JING Wenjun1, ZHANG Lianzhen1, WANG Bingqi1, QIN Hao3
1. College of Pipeline and Civil Engineering, China University of Petroleum, Qingdao 266580, Shandong, China;
2. POWERCHINA Chengdu Engineering Corporation Limited, Chengdu 610072, Sichuan, China;
3. Institute of Defense Engineering, AMS, PLA, Beijing 100850, China
Website Copyright © Hazard Control in Tunnelling and Underground Engineering.
Address: The Editorial Office of "Hazard Control in Tunneling and Underground Engineering" B733, Shandong University Central Campus, 27 Shanda South Road, Jinan City, Shandong Province, China: 250100 Tel: 0531-88366735 E-mail: tunnel@sdu.edu.cn
Powered by Beijing Magtech Co. Ltd