Hazard Control in Tunnelling and Underground Engineering  2026, Vol. 8 Issue (3): 157-162    DOI: 10.19952/j.cnki.2096-5052.2026.03.15
Current Issue | Archive | Adv Search |
Soil stress path in the whole process of excavation and hoisting of working shaft in silty clay
Wang Dong1, Zhang Zhongkun2*, Liu Yan3, Zhang Shuming3, Hu Weidong4, Xu Jing1, Li Junyao5, Lü Changhuai6, Yang Fan7
1. Jinan City Construction Group Co., Ltd., Jinan 250014, Shandong, China;
2. Jinan Construction Group Co., Ltd., Jinan 250014, Shandong, China;
3. School of Civil Engineering and Architecture, University of Jinan, Jinan 250022, Shandong, China;
4. China Railway Siyuan Survey and Design Group Co., Ltd., Wuhan 430063, Hubei, China;
5. Fourth Geological Group of Shandong Provincial Bureau of Geological Mineral Exploration and Development, Weifang 261021, Shandong, China;
6. China Electric Power Engineering Consulting Group Jiangxi Electric Power Design Institute Co., Ltd., Nanchang 330096, Jiangxi, China;
7. Jinan Dinghui Civil Engineering Technology Co., Ltd., Jinan 250002, Shandong, China
Website Copyright © Hazard Control in Tunnelling and Underground Engineering.
Address: The Editorial Office of "Hazard Control in Tunneling and Underground Engineering" B733, Shandong University Central Campus, 27 Shanda South Road, Jinan City, Shandong Province, China: 250100 Tel: 0531-88366735 E-mail: tunnel@sdu.edu.cn
Powered by Beijing Magtech Co. Ltd