Hazard Control in Tunnelling and Underground Engineering  2026, Vol. 8 Issue (3): 23-30    DOI: 10.19952/j.cnki.2096-5052.2026.03.03
Current Issue | Archive | Adv Search |
Prediction of settlement during construction of twin large-diameter shield tunnels
Zhao Shichao1,2, Wang Jianhong1,3*, Wang Chao1,4, Lu Jialin1, Du Changyan1,4
1. School of Qilu Transportation, Shandong University, Jinan 250002, Shandong, China;
2. Jinan City Construction Group Co., Ltd., Jinan 250014, Shandong, China;
3. Faculty of Science and Engineering, Waseda University, Tokyo 1698555, Japan;
4. China Railway 14th Bureau Group Mega Shield Construction Engineering Co., Ltd., Nanjing 211899, Jiangsu, China
Website Copyright © Hazard Control in Tunnelling and Underground Engineering.
Address: The Editorial Office of "Hazard Control in Tunneling and Underground Engineering" B733, Shandong University Central Campus, 27 Shanda South Road, Jinan City, Shandong Province, China: 250100 Tel: 0531-88366735 E-mail: tunnel@sdu.edu.cn
Powered by Beijing Magtech Co. Ltd