Research and application of comprehensive prevention and control method for water inrush in water enriched under-crossing river tunnel |
XIAN Guo1, SHI Shaoshuai2,3*, ZHAO Yong3, XIAO Guangzhi4, YU Yu5, WANG Juntao6, BU Lin2
|
Research and application of comprehensive preventionand control method for water inrush in water enrichedunder-crossing river tunnelXIAN Guo1, SHI Shaoshuai2, 3*, ZHAO Yong3, XIAO Guangzhi4, YU Yu5, WANG Juntao6, BU Lin2(1. Chengdu-Lanzhou Railway Co., Ltd., Chengdu 610036, Sichuan, China; 2. Geotechnical and Structural Engineering Research Center, Shandong University, Jinan 250061, Shandong, China; 3. China Railway Economic and Planning Research Institute, Beijing 100038, China; 4. Engineering Management Center of Ministry of Railways, Beijing 100844, China; 5. China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610031, Sichuan, China; 6. China Railway19th Bureau Group Co., Ltd., Beijing 100176, China |
|
|
Abstract During the process of tunnel construction in karst area, accurate geological prediction and reasonable mitigation measures is the key to prevent water inrush disaster. Based on the research background of Yuelongmen tunnel of Chengdu to Lanzhou railway, the prediction methods for water inrush sources were introduced and the main problems 2019年 - 第1卷第2期鲜国,等:强富水隧道下穿河段突涌水灾害综合防控方法研究与应用 \=-for each method were summarized. The engineering geological and hydrogeological conditions of Yuelongmen tunnel was analyzed, the tunnel induced polarization method was utilized to detect the three-dimensional position, and spatial distribution pattern of rich water area. Combined with target drilling and tunnel excavation, the prediction results were verified effectively. The continuous advanced peripheral grouting method was adopted for the treatment for the rich water area. The research results can be used as reference for similar projects.
|
Received: 13 July 2018
Published: 29 July 2019
|
|
|
|
[1] |
徐则民,黄润秋. 深埋特长隧道及其施工地质灾害[M]. 成都:西南交通大学出版社,2000:1-2.
|
[2] |
钱七虎. 地下工程建设安全面临的挑战与对策[J]. 岩石力学与工程学报,2012,31(10):1945-1956. QIAN Qihu. Challenges faced by underground projects construction safety and countermeasures[J]. Chinese Journal of Rock Mechanics and Engineering, 2012, 31(10): 1945-1956.
|
[3] |
王梦恕. 大瑶山隧道——20世纪隧道修建新技术[M]. 广州:科学技术出版社,1994.
|
[4] |
王梦恕. 对岩溶地区隧道施工水文地质超前预报的意见[J]. 铁道勘查,2004(1):7-10. WANG Mengshu. Hydrogeological and geological forecast of tunnel construction in the karst district[J]. Railroad Survey, 2004(1):7-10.
|
[5] |
刘斌, 李术才, 张庆松,等. 隧道地质灾害预警体系中岩溶裂隙水综合预报技术研究[J]. 山东大学学报(工学版), 2009, 39(3):115-121. LIU Bin, LI Shucai, ZHANG Qingsong, et al. Study of the prediction of karst-fractured groundwater in prediction and early warning system of tunnel geologic hazards[J]. Journal of Shandong University(Engineering Science), 2009, 39(3):115-121.
|
[6] |
李术才, 刘斌, 孙怀凤,等. 隧道施工超前地质预报研究现状及发展趋势[J]. 岩石力学与工程学报, 2014, 33(6):1090-1113. LI Shucai, LIU Bin, SUN Huaifeng, et al. State of art and trends of advanced geological prediction in tunnel construction[J]. Chinese Journal of Rock Mechanics and Engineering, 2014, 33(6):1090-1113.
|
[7] |
李术才, 薛翊国, 张庆松,等. 高风险岩溶地区隧道施工地质灾害综合预报预警关键技术研究[J]. 岩石力学与工程学报, 2008, 27(7):1297-1307. LI Shucai, XUE Yiguo, ZHANG Qingsong, et al. Key technology study on comprehensive prediction and early-warning of geological hazards during tunnel construction in high-risk karst areas[J]. Chinese Journal of Rock Mechanics and Engineering, 2008, 27(7):1297-1307.
|
[8] |
李术才,李树忱,张庆松,等. 岩溶裂隙水与不良地质情况超前预报研究[J]. 岩石力学与工程学报,2007,26(2):217-225. LI Shucai, LI Shuchen, ZHANG Qingsong, et al. Forecast of karst-fractured groundwater and defective geological conditions[J]. Chinese Journal of Rock Mechanics and Engineering, 2007, 26(2):217-225.
|
[9] |
张庆松, 韩伟伟, 李术才,等. 灰岩角砾岩破碎带涌水综合注浆治理[J]. 岩石力学与工程学报, 2012, 31(12):2412-2419. ZHANG Qingsong, HAN Weiwei, LI Shucai, et al. Comprehensive Grouting Treatment For Water Gushing Analysis in limestone breccias fracture zone[J]. Chinese Journal of Rock Mechanics and Engineering, 2012, 31(12):2412-2419.
|
[10] |
苏国举. 齐岳山隧道岩溶涌水治理关键技术[J]. 铁道建筑技术, 2016(8):50-54. SU Guoju. Key technologies for water gushing treatment of Qiyueshan Karst Tunnel[J]. Railway Construction Technology, 2016(8):50-54.
|
[11] |
荆志东. 特长隧道地质超前预报方法研究[J].铁道勘察, 2005(3):46-48. JING Zhidong. Geological predicting in construction of extra-long-tunnels[J]. Railway Investigation and Surveying, 2005(3):46-48.
|
[12] |
王华, 吴光, 冯涛,等. 渝怀线圆梁山隧道超前地质钻探预报技术应用研究[J].铁道建筑, 2007(2):36-38. WANG Hua, WU Guang, FENG Tao, et al. Application and study on the advance drilling geological prediction in Yuangliangshan Tunnel[J]. Railway Engineering, 2007(2):36-38.
|
[13] |
刘志刚, 刘秀峰. TSP(隧道地震勘探)在隧道隧洞超前预报中的应用与发展[J].岩石力学与工程学报, 2003, 22(8):1399-1402. LIU Zhigang, LIU Xiufeng. TSP application and development in tunnel lead forecast[J]. Chinese Journal of Rock Mechanics and Engineering, 2003, 22(8):1399-1402.
|
[14] |
薛翊国,李术才,张庆松,等. TSP 超前预报系统探测岩溶隧道的应用研究[J]. 地下空间与工程学报,2007,21(6):1187-1191. XUE Yiguo, LI Shucai, ZHANG Qingsong, et al. Application of TSP advanced prediction to tunnel in karst areas[J]. Chinese Journal of Underground Space and Engineering, 2007, 21(6):1187-1191.
|
[15] |
刘斌, 李术才, 李树忱, 等. 复信号分析技术在地质雷达预报岩溶裂隙水中的应用研究[J]. 岩土力学, 2009, 30(7):2191-2196. LIU Bin, LI Shucai, LI Shuchen, et al. Study of application of complex signal analysis to predicting karst-fractured ground water with GPR[J]. Rock and Soil Mechamics, 2009, 30(7):2191-2196.
|
[16] |
孙怀凤, 李术才, 李貅,等. 隧道瞬变电磁多点阵列式探测方法研究[J]. 岩石力学与工程学报, 2011, 30(11):2225-2233. SUN Huaifeng, LI Shucai, LI Xiu, et al. Research on transient electromagnetic multipoint array detection method in tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 2011, 30(11):2225-2233.
|
[17] |
王鹰,陈强,魏有仪,等. 红外线探测技术在圆梁山隧道突水预报中的应用[J]. 岩石力学与工程学报,2003,22(5):855-857. WANG Ying, CHEN Qiang, WEI Youyi, et al. Application of infrared acquisition technology in prediction of water gushing in Yuanliangshan tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 2003, 22(5):855-857.
|
[18] |
李术才, 刘斌, 李树忱,等. 基于激发极化法的隧道含水地质构造超前探测研究[J]. 岩石力学与工程学报, 2011, 30(7):1297-1309. LI Shucai, LIU Bin, LI Shuchen, et al. Study of advanced detection for tunnel water-bearing geological structures with induced polarization method[J]. Chinese Journal of Rock Mechanics and Engineering, 2011, 30(7):1297-1309.
|
[19] |
李术才, 聂利超, 刘斌,等. 多同性源阵列电阻率法隧道超前探测方法与物理模拟试验研究[J]. 地球物理学报, 2015, 58(4):1434-1446. LI Shucai, NIE Lichao, LIU Bin, et al. Advanced detection and physical model test based on multi-electrode sources array resistivity method in tunnel[J]. Chinese Journal of Geophysics, 2015, 58(4):1434-1446.
|
[20] |
LI Shucai, LIU Bin, XU Xinji, et al. An overview of ahead geological prospecting in tunneling[J]. Tunnelling & Underground Space Technology, 2017, 63:69-94.
|
|
|
|