Hazard Control in Tunnelling and Underground Engineering  2026, Vol. 8 Issue (3): 66-75    DOI: 10.19952/j.cnki.2096-5052.2026.03.07
Current Issue | Archive | Adv Search |
Research on calculation model of critical smoke control velocity for evacuation passages in shield tunnels
Luo Chiheng1, Guo Yuanjun2, Jia Yao2, Jiang Xuepeng2*
1. China Railway Siyuan Survey And Design Group Co., Ltd., Wuhan 430063, Hubei, China;
2. School of Resource and Environmental Engineering, Wuhan University of Science and Technology, Wuhan 430081, Hubei, China
Website Copyright © Hazard Control in Tunnelling and Underground Engineering.
Address: The Editorial Office of "Hazard Control in Tunneling and Underground Engineering" B733, Shandong University Central Campus, 27 Shanda South Road, Jinan City, Shandong Province, China: 250100 Tel: 0531-88366735 E-mail: tunnel@sdu.edu.cn
Powered by Beijing Magtech Co. Ltd