Home
About
Editorial Board
Journal Council
Instruction
Subscription
Advertising
Contact Us
中文
Instruction for Authors
Writing Guidance
Ethics Statement
Top Read Articles
Published in last 1 year
|
In last 2 years
|
In last 3 years
|
All
Please wait a minute...
For Selected:
View Abstracts
Download Citations
EndNote
Reference Manager
ProCite
BibTeX
RefWorks
Toggle Thumbnails
Select
Key design techniques of the north extension project of Jinan Jiluo Road Yellow River Tunnel
ZHONG Jianmin, ZHANG Liangliang, HE Yingdao, LUO Chiheng, XIONG Yifan, WANG Chao
Hazard Control in Tunnelling and Underground Engineering
Select
Influence mechanism of large diameter tunnel construction on adjacent buildings
DING Jianqi, WANG Chencheng, ZHU Xiangshan, ZHANG Xiang, FU Gang, XU Jingmin
Hazard Control in Tunnelling and Underground Engineering
Select
Study on interaction mechanism and disturbance effect of multi disc cutter cutting concrete pile foundation
SHEN Xiang, ZHANG Haibin, DUAN Kai, ZENG Qingcheng, HUANG Shuhua
Hazard Control in Tunnelling and Underground Engineering 2025, 7 (
2
): 21-30. DOI: 10.19952/j.cnki.2096-5052.2025.02.03
Abstract
PDF
(14177KB)
In order to investigate the interaction mechanism between a shield machine and concrete pile foundations during cutting, the cutting-pile project at the Zhonghe Building group on the East Line of the Haizhu Bay Highway Tunnel was selected as the case study. Based on on-site exploration data, a finite-element model was employed to simulate the process of cutting a single pile with the disc cutter. The cutting forces on the disc cutter and the dynamic responses of both the soil and the pile were analyzed in detail. The simulation results showed that the pile's displacement response during the penetration phase was significantly greater than during the cutting phase, with the responses during penetration being concentrated mainly in the
y
and
z
directions. Moreover, the mean normal force acting on the disc cutter was higher in the penetration phase than in the cutting phase; when the strength contrast between adjacent media was large, the cutter force exhibited a pronounced discontinuity at their interface, thereby increasing the possibility of fatigue damage. The responses of the pile, the surrounding soil, and the cutter were thus characterized throughout the cutting process, and the findings were expected to provide valuable guidance for reducing safety risks in similar shield tunneling projects.
Reference
|
Related Articles
|
Metrics
Select
Experimental analysis of vertical water curtain and effectiveness of water curtain system in an underground water sealed cavern
WEI Songyuan, LI Hanshuo, PENG Zhenhua, WANG Zhechao, LI Wei
Hazard Control in Tunnelling and Underground Engineering
Select
Application of the steel pipe pile arch cover method in large-span underground metro stations in weak and fragmented rock strata
WANG Lichuan, HE Weiguo, ZHANG Junru, WU Hongbin, JIANG Xinqiang, ZHANG Huijian, WANG Wen, HUANG Linxiang
Hazard Control in Tunnelling and Underground Engineering 2025, 7 (
2
): 1-12. DOI: 10.19952/j.cnki.2096-5052.2025.02.01
Abstract
PDF
(13431KB)
To address the issue that the traditional arch cover method relies on the support of hard underlying bedrock and is difficult to function in soft and broken strata, the steel pipe pile column arch cover method, which can effectively exert the efficacy of the arch cover method in soft and broken strata, was proposed based on the Jinjiang Road Station project of Guiyang Rail Transit Line S1, and its construction mechanical characteristics were studied. The research results showed that steel pipe piles were added below the arch cover foundation in the steel pipe pile column arch cover method. On the one hand, the steel pipe piles served as the foundation of the arch cover to improve its bearing capacity; on the other hand, when the lower half section of the station was excavated, they played the role of “advanced support”, constrained the deformation of the sidewall rock mass, and ensured the overall stability of the main structure. Compared with the traditional arch cover method, the steel pipe pile column arch cover method could effectively reduce stratum settlement, and the steel pipe piles shared the surrounding rock pressure, thereby reducing the maximum and minimum principal stresses of the initial support structure system. During the construction of the steel pipe pile column arch cover method, the construction of the arch cover part was the key to the method. After the construction of the arch cover and the station's initial support was completed, the maximum structural stress was located in the junction area between the sidewall and the inverted arch, which was the focus of attention during construction. The steel pipe pile column arch cover method, which uses a support system combining four pilot tunnel double-sidewall drift excavation, steel-reinforced concrete arch cover, and steel pipe pile columns, was successfully applied in the Jinjiang Road Station of Guiyang Rail Transit Line S1. Relying on the efficient coordination of the divided pilot tunnel construction mode, special trolley mold casting, and synchronous pouring technology, the construction period was shortened by approximately 10 months compared with the traditional arch cover method, the operation efficiency was significantly improved, and the impact on urban traffic was reduced.
Reference
|
Related Articles
|
Metrics
Select
Research on coal damage identification model based on ConDenseNet architecture and its optimization
GAO Xiancheng
Hazard Control in Tunnelling and Underground Engineering
Select
Study on the effect of makeup air supplementation on fire smoke control in subway tunnel
LEI Wenjun, GUO Lili, ZHAO Xuming, TAI Chuanmin, QI Yue
Hazard Control in Tunnelling and Underground Engineering 2025, 7 (
2
): 31-41. DOI: 10.19952/j.cnki.2096-5052.2025.02.04
Abstract
PDF
(9745KB)
To address the issues of excessive air volume and insufficient targeting effectiveness in traditional subway tunnel make-up air systems, a novel composite ventilation method was proposed. This approach integrated side-supply in the breathing zone with bottom-supply ventilation based on occupant evacuation behavior patterns, with the objective of investigating its effectiveness in controlling smoke dispersion in evacuation passages. A physical model of a metro tunnel section was constructed using numerical simulation. Comparative analysis was conducted on the distribution patterns of CO mass concentration, temperature, and visibility in evacuation pathways under four distinct ventilation conditions: natural air replenishment, breathing-zone lateral air supply, bottom air supply, and combined ventilation modes.The study found that natural make-up air had the worst effect on controlling fire smoke in the evacuation channel, with visibility, CO mass concentration, and temperature all failing to meet personnel evacuation requirements.Breathing zone side-feeding make-up air could control the CO mass concentration in the evacuation channel below 62 mg/m
3
, but the mixing of make-up air and smoke caused the average temperature in the evacuation channel to reach 227 ℃, which did not satisfy the requirements for safe personnel evacuation. For bottom make-up air, the average temperature in the evacuation channel exceeded 300 ℃, and the average CO mass concentration was 100 mg/m
3
, both higher than the safety parameters required for personnel evacuation. When the combined make-up air of breathing zone side-feeding and bottom-feeding was applied, with the air volume ratio of side-feeding to bottom-feeding being 6∶1 and the corresponding wind speeds being 1.8 m/s and 0.3 m/s respectively, the CO mass concentration in the evacuation channel was 34.6 mg/m
3
, the temperature was 59.2 ℃, and the visibility was 18.6 m—all meeting the standards for safe personnel evacuation. The combined make-up air method of side-feeding in the breathing zone and bottom-feeding can effectively control fire smoke in metro tunnel evacuation channels, providing a theoretical basis for precise make-up air design in underground spaces aimed at ensuring personnel safety.
Reference
|
Related Articles
|
Metrics
Select
Application of the steel pipe pile arch cover method in large-span underground metro stations in weak and fragmented rock strata
WANG Lichuan , HE Weiguo, ZHANG Junru , WU Hongbin , JIANG Xinqiang , ZHANG Huijian , WANG Wen , HUANG Linxiang
Hazard Control in Tunnelling and Underground Engineering
Select
Simulation study on the forward problem of jet grouting pipe reinforcement based on DC resistivity method
DENG Xifei, SHEN Zhijun, WANG Tao, JIANG Shenghua, YANG Jie, LI Hongbo
Hazard Control in Tunnelling and Underground Engineering 2025, 7 (
2
): 13-20. DOI: 10.19952/j.cnki.2096-5052.2025.02.02
Abstract
PDF
(9975KB)
The feasibility of resistivity tomography for monitoring jet grouting pipe was investigated through forward simulation of the DC resistivity method. A three-dimensional solid model of jet-grouted pile reinforcement was established by using COMSOL Multiphysics software, and forward simulation analyses were carried out on different excitation modes, electrode parameters, aquifer parameters, and construction processes. It was demonstrated that the opposite-side excitation mode exhibited a stronger forward response peak. The electrode-to-pile distance and aquifer depth significantly affected electrical signals. During the construction process, the changes in the voltage signal were very pronounced in both the drilling and grouting stages, the grouting process had a more pronounced effect. These conclusions verified the feasibility of DC resistivity for real-time jet-grouting monitoring, systematically analyzed influencing factors, provided a theoretical basis for construction monitoring, and promoted the application of this technology in engineering practice.
Reference
|
Related Articles
|
Metrics
Select
Triaxial compression behavior of sandstone under temperature influence: loading characteristics, shear deformation, and development of prediction software
ZHONG Hao, CAI Xianqing, SUN Hao, KONG Qingxuan, ZHANG Yongping
Hazard Control in Tunnelling and Underground Engineering 2025, 7 (
2
): 81-95. DOI: 10.19952/j.cnki.2096-5052.2025.02.09
Abstract
PDF
(11898KB)
This study conducted triaxial compression tests on sandstone under temperatures of 20-150 ℃ and confining pressures of 5-35 MPa and systematically revealed the coupled effects of temperature and confining pressure on the loading characteristics, shear deformation, and failure modes of sandstone. The results showed that in the low-temperature range(20-60 ℃), sandstone predominantly exhibits brittle failure, with the shear deformation band angle significantly decreasing as confining pressure increases(64.7°→58.3°). In the high-temperature range(≥120 ℃), plastic yielding characteristics were intensified, and at 150 ℃, the increase in confining pressure(5-35 MPa)resulted in a 15.3° reduction in the shear angle. The failure mode transitions from tensile failure under low confining pressure to shear failure under high confining pressure, with elevated temperatures increasing the roughness of failure surfaces. Compared to the Mogi-Coulomb, Drucker-Prager, and Tresca criteria, the modified Lade criterion was found to demonstrate optimal fitting performance(
R
2
≥0.97)by incorporating deviatoric stress invariants and the Lode angle parameter. Based on this criterion, a prediction model for shear deformation band angles was developed. The developed multi-temperature discrete prediction software, integrated with PyCharm and Gradio, achieved high-precision predictions within 0.8 seconds(absolute error: 2.5°,
R
2
=0.92). The output parameters were designed to be embedded into finite element platforms, providing theoretical and practical tools for stability assessments of high-stress tunnels and deep rock mass engineering.
Reference
|
Related Articles
|
Metrics
News
More
Meeting
More
»
2024 Forum for Youth Scholars of Geotechnical Engineering in Guangdong-Hong Kong-Macao Greater Bay
2024-06-19
»
2023IFUS
2023-12-04
»
The 11th National Conference on Soil Dynamics
2023-11-17
»
13th Asian Rock Mechanics Symposium
2023-11-17
»
World Tunnel Congress 2024
2023-11-16
»
The 10th Internationale Conference on Infrastructure Development of Underground Space
2023-11-09
»
The 14th International Symposium on Pipeline Engineering and Trenchless Technology
2023-11-09
»
Internationale Symposium on Environmental,Geological and Geotechnical Engineering
2023-11-06
Website Copyright © Hazard Control in Tunnelling and Underground Engineering.
Address: The Editorial Office of "Hazard Control in Tunneling and Underground Engineering" B733, Shandong University Central Campus, 27 Shanda South Road, Jinan City, Shandong Province, China: 250100 Tel: 0531-88366735 E-mail: tunnel@sdu.edu.cn
Powered by Beijing Magtech Co. Ltd