Construction stability of deeply buried highway tunnel through fault fracture zones in mountainous areas
YANG Li1, XIA Zengxuan2, LOU Wenjie2, LIU Shan2, LI Fengting3*, WU Ke3
1. Zhaotong Dayong Expressway Investment and Development Co., Ltd., Zhaotong 657000, Yunnan, China; 2. Shandong Provincial Communications Planning and Design Institute Group Co., Ltd., Jinan 250101, Shandong, China; 3. School of Civil Engineering, Shandong University, Jinan 250061, Shandong, China
Abstract: In order to investigate the stress and strain state of the surrounding rock and the effect of supporting structure of the deep buried tunnel through the fault zone in mountainous area, taking Lianfeng Mountain Tunnel Project as the research background, based on ABAQUS large-scale finite element numerical computation program, the mechanics calculation model of the construction of the deep buried tunnel through the fault zone was established, and the change rule of the structural stress state and the horizontal and vertical settlement rule of the mountain after the tunnel excavation and lining were studied. The results showed that the settlement in the fault zone during tunnel excavation was much larger than that in the normal rock body; the stress difference between the surrounding rock and the peripheral mountain body at the fault zone was larger, and the stress difference at the junction with the normal mountain body was larger; the settlement caused by tunnel excavation affected the range of 50 m, and the settlement at the center of the twin tunnels increased with the increase of vertical height; the excavation of the second tunnel in the construction of the twin tunnels caused the increase of the strain of the first tunnel.
杨立,夏增选,娄文杰,刘杉,李奉庭,武科. 山区深埋公路隧道穿越断层破碎带施工稳定性[J]. 隧道与地下工程灾害防治, 2024, 6(3): 32-42.
YANG Li, XIA Zengxuan, LOU Wenjie, LIU Shan, LI Fengting, WU Ke. Construction stability of deeply buried highway tunnel through fault fracture zones in mountainous areas. Hazard Control in Tunnelling and Underground Engineering, 2024, 6(3): 32-42.
[1] 袁浩. 多隧道开挖诱发山体变形与应力数值模拟[J]. 现代信息科技, 2022, 6(18):142-146. YUAN Hao. Numerical simulation of mountain deformation and stress induced by multi-tunnel excavation[J]. Modern Information Technology, 2022, 6(18): 142-146. [2] 李永靖, 王松, 刘维青, 等. 某隧道穿越富水断层破碎带围岩大变形成因分析及稳定性预测[J]. 矿业研究与开发, 2023, 43(5): 84-90. LI Yongjing, WANG Song, LIU Weiqing, et al. Deformation analysis and stability prediction of surrounding rock of the tunnel located in water-rich fault fracture zone[J]. Mining Research and Development, 2023, 43(5): 84-90. [3] 马恩临, 钟宇健, 喻佳. 基于断裂力学的隧道近接断层破碎带结构破坏分析[J]. 公路, 2023, 68(8): 375-382. MA Enlin, ZHONG Yujian, YU Jia. Structural failure analysis of tunnel approaching fault zone based on fracture mechanics[J]. Highway, 2023, 68(8): 375-382. [4] 刘广进, 彭亚雄, 苏莹, 等. 基于AHP-云模型的隧道断层破碎带施工风险评价[J]. 安全与环境工程, 2023, 30(3): 118-128. LIU Guangjin, PENG Yaxiong, SU Ying, et al. Excavation risk assessment of tunnel fault fracture zone based on AHP-cloud model[J]. Safety and Environmental Engineering, 2023, 30(3): 118-128. [5] 章玉伟, 徐泽鑫, 谢远, 等. 断层破碎带隧道围岩敏感性及沉降控制分析[J]. 科学技术与工程, 2023, 23(8): 3493-3501. ZHANG Yuwei, XU Zexin, XIE Yuan, et al. Analysis of surrounding rock sensitivity and settlement control of tunnel in fault fracture zone[J]. Science Technology and Engineering, 2023, 23(8): 3493-3501. [6] CHEN L L, WANG Y Q, WANG Z F, et al. Characteristics and treatment measures of tunnel collapse in fault fracture zone during rainfall: a case study[J]. Engineering Failure Analysis, 2023, 145: 107002. [7] ZHANG Z Y, LIU H, CHEN H, et al. Study on supporting technology of a mining roadway in fault fracture zone with high altitude[J]. Geotechnical and Geological Engineering, 2023, 41(3): 1839-1854. [8] ZHENG Y, WU K, JIANG Y J, et al. Optimization and design of pre-reinforcement for a subsea tunnel crossing a fault fracture zone[J]. Marine Georesources & Geotechnology, 2023, 41(1): 36-53. [9] 李照众. 高铁隧道断层破碎带围岩参数反演研究[J]. 石家庄铁道大学学报(自然科学版), 2022, 35(4):53-59. LI Zhaozhong. Inversion study of surrounding rock parameters in fault fracture zone of high speed railway tunnel[J]. Journal of Shijiazhuang Tiedao University(Natural Science Edition), 2022, 35(4): 53-59. [10] 凌森林, 田世雄, 路军富, 等. 隧道砂卵石围岩超前小导管注浆参数优化研究[J]. 铁道标准设计, 2019, 63(6): 114-119. LING Senlin, TIAN Shixiong, LU Junfu, et al. Study on optimization of grouting parameters of advanced ducts in sand and gravel surrounding rock of tunnels[J]. Railway Standard Design, 2019, 63(6): 114-119. [11] 赖友烽.山区高速公路隧道穿越复杂岩层进洞方案探讨[J].交通科技与管理,2023,4(24):57-60. [12] 白皓,潘文韬,谢金池,等.偏压隧道变形破坏机理及超前预加固研究[J].路基工程,2021(4):218-224. BAI Hao, PAN Wentao, XIE Jinchi, et al. Research on deformation and failure mechanism of unsymmetrical loading tunnel and advanced pre-reinforcement[J]. Subgrade Engineering, 2021(4): 218-224. [13] 张宁.公路隧道施工中不良地质判断与处理技术[J].西部交通科技,2018(12):85-90. ZHANG Ning. Adverse geological judgment and treatment technology in highway tunnel construction[J]. Western China Communications Science & Technology, 2018(12): 85-90. [14] 李奎.公路隧道工程不良地质段施工技术分析[J].科学技术创新,2022(23):128-131. LI Kui. Analysis on construction technology of unfavorable geological section in highway tunnel engineering[J]. Scientific and Technological Innovation, 2022(23): 128-131. [15] 王杰,盛俭,赵梦丹,等.康西瓦断裂错动对近断层隧道影响的数值模拟分析[J].地震工程与工程振动,2022,42(3):235-242. WANG Jie, SHENG Jian, ZHAO Mengdan, et al. Numerical simulation analysis of the influence of Karakax fault dislocation on near-fault tunnel[J]. Earthquake Engineering and Engineering Dynamics, 2022, 42(3): 235-242. [16] 邹嘉炜,陈美鹏,万进明,等.断层作用下高铁隧道受力变形模拟研究[J].四川建材,2024,50(3):175-176. ZOU Jiawei, CHEN Meipeng, WAN Jinming,et al. Simulation study on deformation of high-speed railway tunnel under fault action[J]. Sichuan Building Materials, 2024, 50(3): 175-176. [17] 王占奎,米献炜,崔江余,等.帷幕注浆技术在天河山隧道穿越富水断层破碎带施工中的应用[J].施工技术(中英文),2023,52(6):84-89. WANG Zhankui, MI Xianwei, CUI Jiangyu, et al. Application of curtain grouting technology in Tianheshan Tunnel construction crossing water-rich fault fracture zone[J]. Construction Technology, 2023, 52(6): 84-89. [18] 马艺虎, 周容名, 周春雨, 等. 高地应力断层破碎带隧道变形及受力特征研究[J]. 施工技术(中英文),2024,53(6): 49-55. MA Yihu, ZHOU Rongming, ZHOU Chunyu, et al. Stress and deformation characteristics of the tunnel in high in-situ stress fault fracture zone[J]. Construction Technology, 2024, 53(6): 49-55. [19] 杨圣安,史建松,王洪亮.隧洞壁后注浆加固工艺及效果评价研究[J/OL].地下水.(2024-03-22)[2024-04-22].https://link.cnki.net/urlid/61.1096.TV.20240322.1144.002. [20] 王禹淇,李忠义,王可,等.穿越近平行断层系的公路隧道开挖围岩变形特性研究[J].北方交通,2023(12):78-82. WANG Yuqi, LI Zhongyi, WANG Ke, et al. Research on deformation characteristics of surrounding rock during the excavation of highway tunnel crossing the subparallel fault system[J]. Northern Communications, 2023(12): 78-82. [21] 王天木,郑贺民,徐飞,等.双断层错动下隧道衬砌结构力学响应研究[J].国防交通工程与技术,2023,21(6):30-34. WANG Tianmu, ZHENG Hemin, XU Fei, et al. Research on the structural response of tunnel-lining under double-fault dislocation[J]. Traffic Engineering and Technology for National Defence, 2023, 21(6): 30-34. [22] 王淑娟.跨断层深海隧道衬砌变形规律及加固措施研究[J].水利与建筑工程学报,2022,20(3):67-75. WANG Shujuan. Deformation law and reinforcing measures of lining in deep-sea tunnels crossing faults[J]. Journal of Water Resources and Architectural Engineering, 2022, 20(3): 67-75. [23] EINSTEIN H H,SCHWARTZ C W. Simplified analysis for tunnel supports[J].Journal of Geotechnical and Geoenvironmental, 1979, 105: 499-518.