Abstract: Using the section where the main line and ramps merge into the super-large span continuous variable cross-section of the Second Qingdao Jiaozhou Bay Subsea Tunnel, this paper proposed a dual guide tunnel advance-central column reverse excavation construction method under specific conditions to ensure the excavation construction stability of shallow-buried, large-span, continuously variable cross-section tunnels. The method's rationality and effectiveness were validated through finite element analysis and field monitoring data. The results showed that maintaining the original design's excavation partitions and using the proposed method could significantly enhance construction efficiency, with deformation and stress on the tunnel support structure within acceptable limits, ensuring structural safety and stability. Numerical simulation analysis showed that the reverse excavation of the central guide tunnel caused a rapid increase in the uplift of the invert, and stress concentration was likely to occur at the side walls of the tunnel, especially in the large-span section. During lateral excavation, the excavation of the lower bench significantly increased the load on the temporary support gantry, and stress concentration was prone to occur at the joints of the steel beams. During lateral expansion construction, the crown settlement and clearance convergence stabilized at approximately 9 mm, the initial support and surrounding rock contact pressure reached up to 70 kPa, and the maximum axial stress on the lining calculated empirically was about 0.354 MPa, with surrounding rock deformation and support stress meeting the standards. The dual guide tunnel advance-central column reverse excavation method had been successfully applied to the entrance section of the second Qingdao Jiaozhou Bay Subsea Tunnel.
[1] 洪开荣, 冯欢欢. 中国公路隧道近10年的发展趋势与思考[J]. 中国公路学报, 2020, 33(12): 62-76. HONG Kairong, FENG Huanhuan. Development trends and views of highway tunnels in China over the past decade[J]. China Journal of Highway and Transport, 2020, 33(12): 62-76. [2] 张俊儒, 吴洁, 严丛文,等. 中国四车道及以上超大断面公路隧道修建技术的发展[J]. 中国公路学报, 2020, 33(1): 14-31. ZHANG Junru, WU Jie, YAN Congwen, et al. Construction technology of super-large section of highway tunnels with four or more lanes in China[J].China Journal of Highway and Transport, 2020, 33(1): 14-31. [3] 徐晓冬, 刘杰, 段彦福, 等. 连霍高速杏花村1号大跨扁平超大断面隧道开挖方案研究[J]. 科学技术与工程, 2023, 23(28): 12258-12264. XU Xiaodong, LIU Jie, DUAN Yanfu, et al. Excavation scheme of the large-span flat and super-large section tunnel of Lianhuo High-speed Xinghua Village No.1[J]. Science Technology and Engineering, 2023, 23(28): 12258-12264. [4] 宋战平, 张强, 赵克明, 等. 基于现场监测及数值分析的隧道双导洞超前施工优化研究[J]. 西安建筑科技大学学报(自然科学版), 2018, 50(5): 654-661. SONG Zhanping, ZHANG Qiang, ZHAO Keming, et al. Optimization study of advanced double-drift tunnel construction based on on-site monitoring and numerical analysis[J]. Journal of Xi'an University of Architecture & Technology(Natural Science Edition), 2018, 50(5): 654-661. [5] 王怀正,宋战平,张学文,等.富水弱胶结地层大断面隧道施工方案优化与工程应用研究[J].现代隧道技术, 2022, 59(2): 210-219. WANG Huaizheng, SONG Zhanping, ZHANG Xuewen, et al. Optimization and application of the construction scheme for large-section tunnels in water-rich and weakly cemented strata[J]. Modern Tunnelling Technology, 2022, 59(2): 210-219. [6] 吴占瑞, 漆泰岳, 唐进才. 浅埋大断面隧道施工工法优化分析[J]. 工业建筑, 2012, 42(8): 102-107. WU Zhanrui, QI Taiyue, TANG Jincai. Optimization analysis of construction method for shallow-buried tunnel with large section[J]. Industrial Construction, 2012, 42(8): 102-107. [7] 于勇. 营盘路湘江隧道水下浅埋大跨段隧道施工工法研究[J]. 隧道建设, 2013, 33(10): 874-882. YU Yong. A study on construction technologies for the shallow, large-span and underwater section of Xiangjiang River crossing tunnel at Yingpan Road[J]. Tunnel Construction, 2013, 33(10): 874-882. [8] 龚彦峰, 张俊儒, 徐向东, 等. 全风化花岗岩富水地层超大断面隧道设计技术[J]. 铁道工程学报, 2015, 32(10): 79-85. GONG Yanfeng, ZHANG Junru, XU Xiangdong, et al. Design technology for super large cross section tunnel in stratum of completely weathered granite with abundant water[J]. Journal of Railway Engineering Society, 2015, 32(10): 79-85. [9] 李树鹏, 张俊儒. 全风化花岗岩浅埋地层超大断面隧道施工工法研究[J]. 公路交通技术, 2019, 35(1): 83-90. LI Shupeng, ZHANG Junru. Study on construction technique of shallow buried tunnel with super section in completely weathered granite[J]. Technology of Highway and Transport, 2019, 35(1): 83-90. [10] 洪军, 郭海满, 张俊儒, 等. 新考塘隧道出口三线渐变段结构选型与施工工法研究[J]. 隧道建设, 2016, 36(8): 953-959. HONG Jun, GUO Haiman, ZHANG Junru, et al. Study of structure selection and construction method for three-line transition section at exit of Xinkaotang Tunnel[J]. Tunnel Construction, 2016, 36(8): 953-959. [11] 刘建友, 吕刚, 张民庆, 等. 京张高铁八达岭长城站超大跨隧道开挖工法研究[J]. 现代隧道技术, 2019, 56(增刊2): 578- 584. LIU Jianyou, LÜ Gang, ZHANG Minqing, et al. Study on extra-large span tunnel excavation methods for Badaling Great Wall Station of Beijing-Zhangjiakou High-Speed Railway[J]. Modern Tunnelling Technology, 2019, 56(Suppl.2): 578-584. [12] 张民庆, 吕刚, 何志军, 等. 八达岭长城站超大跨度隧道设计施工技术研究[J]. 隧道建设(中英文), 2018, 38(3): 372-381. ZHANG Minqing, LÜ Gang, HE Zhijun, et al. Study of design and construction technology of ultra-large-span tunnel at Badaling Great Wall Station[J]. Tunnel Construction, 2018, 38(3): 372-381. [13] 张俊儒, 吴洁, 王圣涛, 等.钢架岩墙组合支撑工法动态施工力学特性及其应用[J]. 中国公路学报, 2019, 32(9): 132-142. ZHANG Junru, WU Jie, WANG Shengtao, et al. Dynamic construction mechanical characteristics and application of combination support method of steel frame and rock wall[J]. China Journal of Highway and Transport, 2019, 32(9): 132-142. [14] 刘杰, 米小强. 大断面黄土公路隧道改进CD法施工方法[J]. 公路交通科技(应用技术版), 2019, 15(5): 272-273. LIU Jie, MI Xiaoqiang. Improved CD method for large-section loess highway tunnel construction[J]. Journal of Highway and Transportation Research and Development, 2019, 15(5): 272-273. [15] 赵博剑. 渐变大断面及分岔隧道施工方法研究[D]. 北京: 北京交通大学, 2019. ZHAO Bojian. Study on construction method of gradually changing large cross-section and bifurcation tunnel[D]. Beijing: Beijing Jiaotong University, 2019. [16] 高红杰. 岩体应变软化模型及其在超大断面分岔式隧道围岩稳定性分析中的应用研究[D]. 北京: 北京交通大学, 2022. GAO Hongjie. Strain softening model of rock mass and its application in stability analysis of surrounding rock of super-large cross-section bifurcated tunnel[D]. Beijing: Beijing Jiaotong University, 2022. [17] 李志强, 薛翊国, 曲立清, 等. 青岛胶州湾第二海底隧道主要不良地质与施工风险分析[J/OL]. 工程地质学报.(2024-07-26)[2024-08-05]. https://doi.org/10.13544/j.cnki.jeg.2022-0756. LI Zhiqiang, XUE Yiguo, QU Liqing, et al. Primary unfavorable geology and construction risks of the second subsea tunnel of Jiaozhou bay in Qingdao city[J/OL]. Journal of Engineering Geology.(2024-07-26)[2024-08-05]. https://doi.org/10.13544/j.cnki.jeg.2022-0756. [18] 中华人民共和国交通运输部.公路隧道设计规范: JTG 3370.1—2018[S]. 北京: 人民交通出版社, 2018. [19] 中华人民共和国住房和城乡建设部.钢结构设计标准: GB 50017—2017[S]. 北京: 中国建筑工业出版社,2017.