Study on long-term settlement of shield tunnels parallelly undercutting existing highway tunnels with variable spacing under cyclic dynamic loading
He Jiacheng1,2, Zhu Chi3, Fu Jinyang3*, Sun Qianhui3, Li Yanan4
1. China Railway Siyuan Survey and Design Group Co., Ltd., Wuhan 430063, Hubei, China; 2. National and Local Joint Engineering Research Center for Underwater Tunnel Technology, Wuhan 430063, Hubei, China; 3. School of Civil Engineering, Central South University, Changsha 410075, Hunan, China; 4. Yellow River Engineering Consulting Co., Ltd., Zhengzhou 450003, Henan, China
Abstract: To reveal the long-term settlement behaviour of an existing highway tunnel caused by a newly constructed shield tunnel passing beneath it in parallel under cyclic train loading, the Yellow River Crossing Tunnel of Jinan Rail Transit Line M2 was taken as the engineering background. Soil dynamic deformation parameters were obtained through laboratory dynamic triaxial tests, and a cumulative plastic deformation-based settlement model was established. Dynamic finite element simulations were then conducted to analyse the ground dynamic stress distribution and the long-term settlement response of the existing highway tunnel under different tunnel clear spacings. The results showed that the ground dynamic stress was mainly concentrated within 10 m beneath the newly constructed shield tunnel, accounting for approximately 60%~70% of the total dynamic stress variation. The settlement of the existing highway tunnel increased with tunnel spacing, while the contribution of vehicle dynamic loading first increased and then decreased. Based on multiple working conditions, a quantitative relationship between tunnel clear spacing and long-term settlement was fitted. The proposed model and fitted formula reflected the controlling effect of tunnel spacing on long-term settlement and provided a targeted method for settlement prediction and safety assessment in similar shield tunnelling undercrossing projects.
何家成,朱驰,傅金阳,孙前辉,李亚楠. 循环动载作用下盾构隧道变间距并行下穿既有公路隧道长期沉降研究[J]. 隧道与地下工程灾害防治, 2026, 8(3): 102-114.
He Jiacheng, Zhu Chi, Fu Jinyang, Sun Qianhui, Li Yanan. Study on long-term settlement of shield tunnels parallelly undercutting existing highway tunnels with variable spacing under cyclic dynamic loading. Hazard Control in Tunnelling and Underground Engineering, 2026, 8(3): 102-114.
[1] Jiang Yujing, Pan Zhutian, Zhang Xuepeng. Tunnel infrastructure health management: a state-of-the-art review on defect development mechanism and robot-aided inspection system[J]. Smart Underground Engineering, 2025, 1(1): 26-39. [2] Chen Weizhong, Tan Xuyan, Yang Jianping. Review of state-of-the-art in structural health monitoring of tunnel engineering[J]. Smart Underground Engineering, 2025, 1(1): 40-50. [3] Monismith C L, Ogawa N, Freeme C R. Permanent deformation characteristics of subgrade soils due to repeated loading[J]. Transportation Research Record, 1975, 537: 1-17. [4] Li D Q, Selig E T. Cumulative plastic deformation for fine-grained subgrade soils[J]. Journal of Geotechnical Engineering, 1996, 122(12): 1006-1013. [5] Chai J C, Miura N. Traffic-load-induced permanent deformation of road on soft subsoil[J]. Journal of Geotechnical and Geoenvironmental Engineering, 2002, 128(11): 907-916. [6] 黄茂松, 李进军, 李兴照. 饱和软粘土的不排水循环累积变形特性[J]. 岩土工程学报, 2006, 28(7): 891-895. Huang Maosong, Li Jinjun, Li Xingzhao. Cumulative deformation behaviour of soft clay in cyclic undrained tests[J]. Chinese Journal of Geotechnical Engineering, 2006, 28(7): 891-895. [7] 魏星, 黄茂松. 交通荷载作用下公路软土地基长期沉降的计算[J]. 岩土力学, 2009, 30(11): 3342-3346. Wei Xing, Huang Maosong. A simple method to predict traffic-load-induced permanent settlement of road on soft subsoil[J]. Rock and Soil Mechanics, 2009, 30(11): 3342-3346. [8] 高广运, 李绍毅, 涂美吉, 等. 地铁循环荷载作用下交叉隧道沉降分析[J]. 岩土力学, 2015, 36(增刊1): 486-490. Gao Guangyun, Li Shaoyi, Tu Meiji, et al. Analysis of settlement of cross tunnels under cyclic metro loading[J]. Rock and Soil Mechanics, 2015, 36(S1): 486-490. [9] 彭红霞, 王怀东, 袁云辉, 等. 列车循环动荷载下地铁四孔交叠隧道长期沉降及控制分析[J]. 城市轨道交通研究, 2021, 24(10): 31-35. Peng Hongxia, Wang Huaidong, Yuan Yunhui, et al. Long-term settlement and control analysis of four-hole overlapping metro tunnel under train cyclic load[J]. Urban Mass Transit, 2021, 24(10): 31-35. [10] 刘维正, 石志国, 章定文, 等. 交通荷载作用下结构性软土地基长期沉降计算[J]. 东南大学学报(自然科学版), 2018, 48(4): 726-735. Liu Weizheng, Shi Zhiguo, Zhang Dingwen, et al. Long-term settlement calculation of structured soft clay foundation under traffic loading[J]. Journal of Southeast University(Natural Science Edition), 2018, 48(4): 726-735. [11] 王加辉, 丁嘉浩, 程姿洋, 等. 三线近距并行盾构隧道掘进数值模拟及变形分析[J]. 沈阳建筑大学学报(自然科学版), 2025, 41(5): 644-655. Wang Jiahui, Ding Jiahao, Cheng Ziyang, et al. Numerical simulation and deformation analysis of three-line closely spaced parallel shield tunneling[J]. Journal of Shenyang Jianzhu University(Natural Science), 2025, 41(5): 644-655. [12] 杨兵明, 刘保国. 地铁列车循环荷载下软土地区盾构隧道长期沉降分析[J]. 中国铁道科学, 2016, 37(3): 61-67. Yang Bingming, Liu Baoguo. Analysis of long-term settlement of shield tunnel in soft soil area under cyclic loading of subway train[J]. China Railway Science, 2016, 37(3): 61-67. [13] 刘汝辉. 软土小净距并行盾构隧道后行掘进对先行隧道的影响[J]. 河南科技大学学报(自然科学版), 2024, 45(3): 61-68. Liu Ruhui. Effect of subsequent tunnel driving on preceding tunnel of parallel shield tunnels with small clear distance in soft soil[J]. Journal of Henan University of Science and Technology(Natural Science), 2024, 45(3): 61-68. [14] Zhou X L, Gong Q M, Tian Z Y, et al. Dynamic response and long-term settlement of four overlapping tunnels subject to train load[C] //Advances in Transportation Geotechnics IV. Cham, Germany: Springer International Publishing, 2022: 33-48. [15] TB 10102—2010铁路工程土工试验规程[S]. [16] 石钰锋, 曹成威, 谈亦帆, 等. 地铁隧道基底饱水风化软岩动力响应及长期沉降研究[J]. 现代隧道技术, 2022, 59(2): 86-95. Shi Yufeng, Cao Chengwei, Tan Yifan, et al. Study on dynamic response and long-term settlement of water-saturated Weathered soft rocks at the base of subway tunnels[J]. Modern Tunnelling Technology, 2022, 59(2): 86-95. [17] 肖军华, 刘建. 循环荷载下粉土路基土的变形性状研究[J]. 中国铁道科学, 2010, 31(1): 1-8. Xiao Junhua, Liu Jian. Research on the deformation behaviors of silt subgrade soil under cyclic loading[J]. China Railway Science, 2010, 31(1): 1-8. [18] 王涛. 跨地裂缝带高铁路基动力稳定性及长期沉降研究[D]. 西安:长安大学, 2020:48-54. Wang Tao. Research on the dynamic stability and settlement of high-speed railway long-term subgrade crossing ground fissure zone[D]. Xi'an: Chang'an University, 2020: 48-54. [19] 宫全美, 罗喆, 袁建议. 提速铁路基床长期累积沉降及等效循环荷载试验研究[J]. 铁道学报, 2009, 31(2): 88-93. Gong Quanmei, Luo Zhe, Yuan Jianyi. Experimental study on long-term cumulative settlement and equivalent cyclic load of speed-up railway subgrade soil[J]. Journal of the China Railway Society, 2009, 31(2): 88-93. [20] 张艳美, 梁波. 几何不平顺条件下高速公路路基的动态响应[J]. 兰州铁道学院学报, 2001, 20(4): 66-69. Zhang Yanmei, Liang Bo. Dynamic response to subgrade of highway in geometric irregularity condition[J]. Journal of Lanzhou, 2001, 20(4): 66-69. [21] 徐林荣, 陈昀灏, 商拥辉, 等. 基于力学-经验模型的交通荷载作用下软基长期沉降计算[J]. 长安大学学报(自然科学版), 2021, 41(5): 1-10. Xu Linrong, Chen Yunhao, Shang Yonghui, et al. Long-term settlement calculation of soft soil foundation under traffic load based on mechanical-empirical model[J]. Journal of Chang'an University(Natural Science Edition), 2021, 41(5): 1-10. [22] Shen S L, Wu H N, Cui Y J, et al. Long-term settlement behaviour of metro tunnels in the soft deposits of Shanghai[J]. Tunnelling and Underground Space Technology, 2014, 40: 309-323.